Search results for: striping no load zone

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 8 of 8
  • STRIPING NO LOAD ZONE ON SHIPWAYS TASK ORDER.

    Type : Contract

    Due : 05 Jul, 2022 (22 months ago)
    Posted : about 2 years ago
    Started : 06 May, 2022 (about 2 years ago)

    STRIPING NO LOAD ZONE ON SHIPWAYS TASK ORDER. Solicitation ID/Procurement Identifier: 70Z04020D62153Y00 Ultimate Completion Date: Tue Jul 05 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)

  • RFP 12192 - Work Release Expansion Project

    Type : Bid Notification

    Due : 13 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 29 Jan, 2020 (about 4 years ago)

    Comply with all applicable accessibility requirements. 1.2 PARKING LAYOUT, STRIPING AND SIGNAGE Standard parking stalls shall be 9' x 20' minimum. Provide code-required accessible parking stalls. Striping shall be 4" wide.

    From: Washington State Department of Corrections (State)

  • 20WT05 Chloramine Dosing Stations

    Type : Bid Notification

    Due : 26 May, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 19 Apr, 2021 (about 3 years ago)

    Traffic Striping 1. Permanent traffic striping shall consist of thermoplastic compounds conforming to ODOT Specification 711. 2. Temporary striping shall be removable marking tape conforming to ODOT Specification 711. 3. Striping paint shall be used only with special approval of the City of Stillwater.

    From: City of Stillwater (City)

  • Tehaleh Segment 2: 198th Ave Main Extension

    Type : Bid Notification

    Due : 16 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 26 May, 2020 (about 3 years ago)

    Tensile Precompressed tensile zone 0.0 Compressive Effective prestress and permanent loads 0.45f Effective prestress, permanent loads and 0.60f AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK Revised: 8/7/17 transient (live) loads Final Stresses at Fatigue Load Compressive Fatigue I Load Combination plus one- half effective prestress and permanent loads 0.40f Variables are as defined in the AASHTO LRFD Bridge Design Specifications. 1 6-02.3(25

    From: Tacoma (City)

  • Drawings

    Type : Bid Notification

    Due : N/A
    Posted : 11 months ago
    Started : 14 May, 2023 (11 months ago)

    EXCEPTION TO SECTION 110.10(B)3: ANY ROOF OBSTRUCTION, LOCATED ON THE ROOF OR ANY OTHER PART OF THE BUILDING, THAT IS ORIENTED NORTH OF ALL POINTS ON THE SOLAR ZONE. 4. STRUCTURAL DESIGN LOADS ON CONSTRUCTION DOCUMENTS. FOR AREAS OF THE ROOF DESIGNATED AS SOLAR ZONE, THE STRUCTURAL DESIGN LOADS FOR ROOF DEAD LOAD AND ROOF LIVE LOAD SHALL BE CLEARLY INDICATED ON THE CONSTRUCTION DOCUMENTS.

    From: Mendota (City)