Type : Contract
STRUCTURAL CONDITION ASSESSMENT (SCA) FOR MEDEA CREEK BRIDGE AT PARAMOUNT RANCH Solicitation ID/Procurement Identifier: 140P2022D0006 Ultimate Completion Date: Wed May 15 17:00:00 GMT 2024
STRUCTURAL CONDITION ASSESSMENT (SCA) FOR MEDEA CREEK BRIDGE AT PARAMOUNT RANCH Solicitation ID/Procurement Identifier: 140P2022D0006 Ultimate Completion Date: Wed May 15 17:00:00 GMT 2024
Tender No: TNPA/2024/01/0002/53528/RFQ Briefing Meeting: 2024-01-25 11:00 Tender Closing Date: 2024-02-01 16:00 Required At: Transnet SOC Ltd Details :- Details :- Details :- Title:Structural Condition Assessment of Tanker Berth at the Port of East London for a period of 10 weeks Tender Number:TNPA/2024/01/0002/53528/RFQDescription:Structural Condition Assessment of Tanker Berth at the Port of East London for a period of 10 weeks Closing Date:2024
The City is seeking proposals from qualified consultants to: complete a structural condition assessment of the structures; conduct a holistic review of the entire corridor to understand interdependencies between the structures; assess potential solutions and cost for removal, maintenance, or, rehabilitation for each structure; review external constraints affecting the structures and the park; and, prepare a strategy that the City can use as a roadmap
The City of Richmond (the “City”) is proposing to perform a detailed structural condition assessment to update the City’s inventory and condition rating for its parks pedestrian foot bridges and other timber and steel circulation structures (the “Project”), as described in the Contract Documents. Contract duration Refer to the description above for full details.
The City is seeking a qualified Consultant to complete a review and structural condition assessment of municipal street lighting poles. The objective of this structural assessment is to provide a rating for the street lighting poles and determine a replacement strategy, as well as point out any safety concerns that require immediate attention. ... See more
The purpose of the current project is to design and develop construction documents for the replacement of the mechanical bar screens including alternate equipment review and selection, electrical, mechanical, engineered bypass pumping, and performance of a structural condition assessment on the existing influent pump station wet well and associated troughs. E-Bidding No