  • MODULAR STRUCTURE INSIDE BUILDING 353

    Type : Bid Notification

    Due : 30 Jun, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 17 Jun, 2022 (22 months ago)

    This requirement is for a Contractor to provide and install a modular structure inside building 353 for the 402d Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. The modular structure will house equipment necessary to stand up a metal additive manufacturing process to produce metal components for various CMXG mission requirements.

    From: Federal Government (Federal)

  • In-Plant Dowty Propeller Modular Structures

    Type : Bid Notification

    Due : 19 Jun, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 11 Jun, 2019 (about 4 years ago)

    SMALL BUSINESS SIZE STANDARD•(a)   NAICS:  236220•(b)  No. of Employees: •(c)   Dollars: $36.5M  REQUIREMENT:CLIN 0001-AA: For a Contractor to provide all tools, parts, materials, equipment, labor, transportation, and supervision necessary to provide, ship, and install three modular structures inside building 350.CLIN 0002-AA: Data (NSP), IAW PD Paragraph 2.11.3, CDRL A001, DI-SESS-81003E, Commercial Drawings/Models and Associated Lists CLIN 0003-

    From: Federal Government (Federal)

  • Job Walk Announcement

    Type : Pre-Bid Notification

    Due : 05 Jun, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 10 Jun, 2019 (about 4 years ago)

    Added:Jun 03, 2019 1:45 pmThis will be a one-time fixed price acquisition for tools, parts, materials, equipment, labor, transportation, and supervision necessary to provide and install three (Dowty Propeller) modular structures inside building 350 at Robins Air Force base (AFB), Georgia. The installation needs to be completed and the facilities fully operational to receive Dowty personnel no later than 26 September 2019.

    From: Federal Government (Federal)

  • Replace Roofing - Building 66 & 67

    Type : Pre-Bid Notification

    Due : 21 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 06 Jun, 2023 (10 months ago)

    IAW FAR 36.204(f), the magnitude of this project is between $1,000,000.00 and $5,000,000.00.The scope of this project consists of the repair of the failed roof on Building B66 ± 45,240 square feet (s.f.) that include a small portion of Building B67 to prevent rainwater from leaking into the buildings and causing damage to the structure and items inside the buildings.

    From: Federal Government (Federal)

  • Replace Roofing - Building 66 & 67

    Type : Pre-Bid Notification

    Due : 21 Sep, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 11 Sep, 2023 (7 months ago)

    to the structure and items inside the buildings.

    From: Federal Government (Federal)

  • CCPS TRN-I Bus Lift

    Type : Bid Notification

    Due : 03 Jan, 2024 (3 months ago)
    Posted : 5 months ago
    Started : 19 Dec, 2023 (4 months ago)

    DescriptionDemolish slab-on-grade inside existing metal building structure, excavate and install two (2) concrete pits and restore the slab-on-grade. Provide electrical and plumbing work per plans and specification. A detailed scope for each bid package is included. Daniel Price will conduct site walks on an as needed basis from 11/13 - 11/16 and from 11/27 - 12/01. Please contact Daniel at (239) 315-9294 to arrange your walk.

    From: Manhattan (Co-op)

  • CCPS TRN-S Bus Lifts

    Type : Bid Notification

    Due : 02 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 18 Jan, 2024 (3 months ago)

    DescriptionDemolish slab-on-grade inside existing metal building structure, excavate and install four (4) concrete pits and restore the slab-on-grade. Provide electrical and plumbing work per plans and specification. A detailed scope for each bid package is included. Lift manufacturer drawings and product brochure included for reference. The project will require 2 separate mobilizations in order to maintain partial operation of bus maintenance.

    From: Manhattan (Co-op)