Type : Bid Notification
Sealed Solicitation Engineering Services for the Red River Area Sidewalk Study Open RFQ #4603 4/30/2024 2:30 PM 1
Sealed Solicitation Engineering Services for the Red River Area Sidewalk Study Open RFQ #4603 4/30/2024 2:30 PM 1
Registration (NEW) NONE Scope of Work The City of Sunnyvale (the “City”) is seeking Proposals from civil engineering firms to provide professional consultant services to perform an engineering study to evaluate and recommend geometric design improvements on Bernardo Avenue from ......
Contract 14-24 Engineering Design & Studies Services 2025 - 2029 All proposals shall be addressed to the Director of Public Works, Municipal Building, 75 North Bonson Street, Platteville, WI 53818, with the name and address of the proposer, contract number and title of work distinctly indicated on the outside of the envelope.
Project: Professional Engineering, Architectural, & Rate Study Services Ref. #: RFSQ-SWE-24-12 Type: RFSQ Status: Open Open Date: Apr 17th 2024, 8:00 AM EDT Intent to Bid Due Date: May 22nd 2024, 2:00 PM EDT Questions Due Date: May 9th 2024, 2:00 PM EDT Close Date: May 23rd 2024, 2:00 PM EDT Days Left: 35 Project Description:This Request for Statement of Qualifications is issued seeking Statements of Qualifications for RFSQ SWE-24-14 Professional Engineering Services for Architecture. Important Events:OngoingOpen DateOnline PortalPosting date for the OpportunityApr 17th 2024, 8:00 AM EDTN/AUpcomingQuestions Due DateOnline PortalDeadline to submit QuestionsMay 9th 2024, 2:00 PM EDTN/AUpcomingIntent to Bid Due DateOnline PortalD...
Jericho Town Forest Dam Removal Study & Engineering Design postdate:- 11/27/2023 09:10 AM EST responsedate:- 12/20/2024 04:00 PM EST
Reference:DR24-PUB-063 / 1832665 Professional services - Traffic study - Synchronization of traffic lights on boul. St-Joseph (Architectural and engineering services) --- Services professionnels - Étude de circulation - Synchronisation des feux de circulation sur le boul.
Qualification statements and a proposal to complete a preliminary engineering study are due June 19th 2017 by 5:00 pm. The proposal shall indicate principles who will be involved in the project, including their experience with and references for similar projects. Work to be completed by fall of 2017. The Board reserves the right to reject any or all proposals. This project will be funded through the Vermont State Revolving Loan Fund