  • TND0022082, Bridge Superstructure and Abutment Substructure Replacement and Other Work

    Type : Bid Notification

    Due : 23 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 19 Jan, 2023 (15 months ago)

    TND0022082, Bridge Superstructure and Abutment Substructure Replacement and Other Work Project Description :Tender available date: January 19, 2023 Tender closing date: February 23, 2023 Project Inquiries: Kenneth Adagala, Project Procurement Officer, Alberta Transportation and Economic Corridors E-mail: kenneth.adagala@gov.ab.ca TENDERS will only be received by email at

    From: MerX (Federal)

  • Ascutney Basin Bridge Superstructure

    Type : Bid Notification

    Due : 30 Apr, 2024 (4 days ago)
    Posted : 2 months ago
    Started : 21 Feb, 2024 (2 months ago)

    The goal of this project is to remove the existing concrete bridge superstructure and replace it with new. The existing concrete superstructure is deteriorated, has been damaged by flooding, and can no longer safely carry current traffic loads. The existing substructure (abutments and wingwalls) will be retained and reused. The project includes related site work, excavation and paving.

    From: Vermont (State)

  • EN24TKE030 – Blais South Bridge Maintenance

    Type : Bid Notification

    Due : 25 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 28 Aug, 2023 (8 months ago)

    Activities will include site monitoring by a contractor supplied Environmental Monitor, removing and replacing the bridge decking/superstructure, repairing and installing new abutments/substructure, hauling and installing rip rap, and rebuilding approaches.

    From: MerX (Federal)

  • Multnomah Creek Trail Bridge Replacement

    Type : Bid Notification

    Due : 16 Apr, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 10 Apr, 2018 (about 6 years ago)

    Only the superstructure is to be removed. The abutment substructures are to remain in-place. The damaged superstructure is to be disconnected from the substructure by removal of the anchor bolt nuts or cutting the anchor bolts as required. The superstructure will then be helicoptered out in one piece to a designated heliport.2) Disposal of the existing trail bridge superstructure.

    From: Federal Government (Federal)

  • EN24TKE030 – Blais South Bridge Maintenance

    Type : Bid Notification

    Due : 25 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 11 Aug, 2023 (8 months ago)

    Activities will include site monitoring by a contractor supplied Environmental Monitor, removing and replacing the bridge decking/superstructure, repairing and installing new abutments/substructure, hauling and installing rip rap, and rebuilding approaches.

    From: British Columbia (State)

  • MODOC NF Wide Bridge Repair Maintenance Solicitation

    Type : Bid Notification

    Due : 15 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 15 Feb, 2024 (2 months ago)

    Work will include work on approaches (roadway, embankments, drainage features), channels, substructures (abutments, piers, etc.), superstructures (girders, diaphragms, end walls, bearing devices, etc.), decks (slab, curbs, etc.), wearing surfaces (running planks, etc.), and traffic safety features (bridge railings, approach railings, signing, etc.).

    From: Federal Government (Federal)

  • LUDLOW VILLAGE BO 1443 (52)

    Type : Bid Notification

    Due : 17 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 18 Oct, 2023 (6 months ago)

    REMOVAL OF EXISTING TRUSS SUPERSTRUCTURE AND CONSTRUCTION OF A PEDESTRIAN BRIDGE ON THE EXISTING ABUTMENTS WITH RELATED SUBSTRUCTURE REPAIR AND APPROACH WORK. ENGINEERS CATEGORY D

    From: Vermont (State)