Type : Bid Notification
Jan 15, 2018 2:00:00 PM (local time) Township of Centre Wellington Reference: RFP# 43-17 Prequalification required: No Township is seeking a qualified consultant team to undertake a Water Supply Master Plan.
Jan 15, 2018 2:00:00 PM (local time) Township of Centre Wellington Reference: RFP# 43-17 Prequalification required: No Township is seeking a qualified consultant team to undertake a Water Supply Master Plan.
The Proposer must have experience with preparing long-term water supply reports such as Water Supply Master Plans, One Water Plan Concept, Urban Water Management Plans (UWMP), Water Supply Assessments (WSA) and/or other similar reports. Additionally, the City desires to enhance its business efficiency to minimize asset failures through optimized designs and management practices.
Bid Classification: Services Bid Type: Request for Proposal Bid Number: RFP-2024-004 Bid Name: Lake Huron Primary Water Supply System Master Plan Bid Status: Open Published Date: Fri Jan 19, 2024 10:00:00 AM (EST) Bid Closing Date: Thu Feb 8, 2024 2:00:00 PM (EST) Question Deadline: Thu Feb 1, 2024 2:00:00 PM (EST) Bid Pricing: $40.00 - Download Only Duration in months: 12 Negotiation Type: Refer to bid document Condition for Participation: Refer
WATER SUPPLY AND TREATMENT MASTER PLAN CONSULTING SERVICES (22-18) 3/20/2018 5/10/2018 10:00 A.M. 7/16/2018 Project Manager: LORI VOGEL, CPPB, SR PROCUREMENT ANALYST 727-562-4632 View
WATER SUPPLY AND TREATMENT MASTER PLAN CONSULTING SERVICES (22-18) (Has Addendum) 3/20/2018 5/10/2018 10:00 A.M. 7/16/2018 Project Manager: LORI VOGEL, CPPB, SR PROCUREMENT ANALYST 727-562-4632 View
Proposers must submit a “Bid Intent” on the Rocky Mountain E-Purchasing System prior to March 23, 2020 at 5:00 p.m. in order to receive pertinent sections of the 2013 Integrated Treated Water Supply Master Plan (ITWSMP) and the 2019 Nelson-Flanders Expansion Planning Study (Basis of Design Reports).
Proposers must submit a “Bid Intent” on the Rocky Mountain E-Purchasing System prior to March 23, 2020 at 5:00 p.m. in order to receive pertinent sections of the 2013 Integrated Treated Water Supply Master Plan (ITWSMP) and the 2019 Nelson-Flanders Expansion Planning Study (Basis of Design Reports).