Search results for: surface aggregate material

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 276
  • Bids for Driving Surface Aggregate Material

    Type : Bid Notification

    Due : 04 May, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 27 Mar, 2021 (about 3 years ago)

    Fine Aggregate Fine aggregate or binder material will be material passing the No. 4 sieve and is subject to the requirements in this subsection. Fine aggregate for driving surface aggregate will consist of material produced by crushing operations, free from mineral clay or silt soil, excluding marine limestone. d.

    From: York (County)

  • Peterson Ridge Trailhead Relocation

    Type : Pre-Bid Notification

    Due : 13 Jan, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 06 Feb, 2020 (about 4 years ago)

    Merchantable trees shall be bucked and decked.Excavation for the parking lot area, the access roadway to trailhead, the kiosk staging area and the ditch for required drainage.Locating government supplied survey points to excavate down to subgrade elevation, for the placement and compaction of base rock and surface aggregate material for the construction of (25) new trailhead parking lot spaces.Placement of asphalt concrete pavement for the apron to

    From: Federal Government (Federal)

  • Tire Derivative Aggregate (TDA) Road Renewal - Anson St

    Type : Bid Notification

    Due : 08 Sep, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 29 Aug, 2023 (8 months ago)

    On completion the project locations require a minimum of 15” of compacted TDA at the bottom of the excavation, covered with 27” of the excavated fill material topped with 6” of surface aggregate material. Bidding and Documents are available on http://www.merx.com.

    From: Canada (Federal)

  • LOCAL LET MAINTENANCE CONTRACT, HANSFORD CO, SURFACE TREATMENT AGGREGATE(MATERIALS ON

    Type : Bid Notification

    Due : 22 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 23 Nov, 2020 (about 3 years ago)

    Status: Posted Contact Name: Contact Number: Contact Email: Response Due Date: 12/22/2020 Response Due Time: 02:00:00 PM Agency/Texas SmartBuy Member Number: 601 Days Solicited: 21+ Days for Solicitation Notice Solicitation Posting Date: 11/23/2020 Last Modified: 11/23/2020 10:00 am Solicitation Description: COUNTY: HANSFORD HIGHWAY: SH0015 TYPE: SURFACE TREATMENT AGGREGATE(MATERIALS ON EST.

    From: Texas (State)

  • LOCAL LET MAINTENANCE CONTRACT, ARMSTRONG CO, SURFACE TREATMENT AGGREGATE(MATERIALS ON

    Type : Bid Notification

    Due : 16 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 15 Jan, 2021 (about 3 years ago)

    Status: Posted Contact Name: Contact Number: Contact Email: Response Due Date: 2/16/2021 Response Due Time: 02:00:00 PM Agency/Texas SmartBuy Member Number: 601 Days Solicited: 21+ Days for Solicitation Notice Solicitation Posting Date: 1/15/2021 Last Modified: 1/15/2021 2:00 pm Solicitation Description: COUNTY: ARMSTRONG HIGHWAY: US0287 TYPE: SURFACE TREATMENT AGGREGATE(MATERIALS ON EST.

    From: Texas (State)

  • Boundary Dagger Road Project in the Salmon-Challis NF

    Type : Pre-Bid Notification

    Due : 01 May, 2024 (3 days ago)
    Posted : 18 days ago
    Started : 16 Apr, 2024 (18 days ago)

    Perform the work in accordance with MSHA 30 CFR, part 56.Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached

    From: Federal Government (Federal)

  • 2017 RUIN PIT CRUSH & STOCKPILE

    Type : Bid Notification

    Due : 06 Jun, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 30 May, 2017 (about 7 years ago)

    Added: Apr 19, 2017 6:32 pm Modified: Apr 27, 2017 2:15 pm Track Changes This project consists of mobilization, clearing and grubbing, as necessary, drilling and blasting, and crushing and stockpiling of an aggregate surface course material at an existing pit. The contract will contain requirements for contractor-provided belt scales and contractor quality control and assurance.

    From: Federal Government (Federal)