Search results for: system at cub

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 10
  • COOLING TOWER WATER TREATMENT SYSTEM AT CUB - FERMILAB

    Type : Bid Notification

    Due : 07 Oct, 2022 (19 months ago)
    Posted : 19 months ago
    Started : 27 Sep, 2022 (19 months ago)

    CONSTRUCTION OF A COOLING TOWER WATER TREATMENT SYSTEM AT CUB LOCATED IN FERMILAB NATIONAL ACCELERATOR LABORATORY IN BATAVIA, IL. 

    From: Federal Government (Federal)

  • DOTI CUBS (Consolidated Utility Billing System)

    Type : Bid Notification

    Due : 09 Apr, 2024 (21 days ago)
    Posted : 2 months ago
    Started : 16 Feb, 2024 (2 months ago)

    29565 - DOTI CUBS (Consolidated Utility Billing System) postdate:- 02/16/2024 responsedate:- 04/09/2024 09:00 AM MDT Solicitation Number:- 29565 to solicitation details & future business opportunities.

    From: Denver General Services Purchasing (City)

  • CUB (FIMS 214) - NORTH ROOFING REPLACEMENT

    Type : Bid Notification

    Due : 17 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 27 Jan, 2023 (15 months ago)

    Replace with new SBS Asphalt 4CID CR G roofing system, including miscellaneous associated work as described in the drawing set “CUB (214) North Roofing Replacement,” FESS Project No. 3-12-02A, dated September 16, 2022. Provide all associated work including but not limited to relocation and reinstallation of existing roof equipment, removal and replacement of all roofing trim, facia, gravel stops, and coping.

    From: Federal Government (Federal)

  • CUB Controls Upgrade

    Type : Bid Notification

    Due : 04 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 06 Aug, 2018 (about 5 years ago)

    The scope of this project is to furnish and install a complete process control system for the Fermilab Central Utility Building. The CUB plant has 4 main processes, Chiller Loop, Cooling Tower & Chemical Loop, LCW Loop and the General Plant.

    From: Federal Government (Federal)

  • Construction of Nursery Kennel and Facilities

    Type : Bid Notification

    Due : 04 Jan, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 13 Dec, 2020 (about 3 years ago)

    The The construction shall include the use of quality materials that are capable of withstanding the tropical rainy climate.The Nursery Kennels, Office/surgery and Closed/training room will be erected with a concrete frame system with pressed clay brick walls; the Puppy Cub and Breeding Kennels will be erected with reinforced clay brick walls.

    From: Federal Government (Federal)

  • Z--Solar Light Bollard Replacement and Fiber Optic System Improvements, HOME

    Type : Pre-Bid Notification

    Due : 31 Aug, 2022 (20 months ago)
    Posted : 22 months ago
    Started : 17 Jun, 2022 (22 months ago)

    Removal of the existing system and replacing it with energy efficient LED self-contained bollards (provided by the Park) will provide a more efficient system, reduce the amount of system to maintain and eliminate a wired system to a main solar panel and battery storage system.Fiber-optic work consists of: This portion of the project consists of adding a new Fiber Optical enclosure panel at the Freeman school and rerouting the existing fiber into the

    From: Federal Government (Federal)

  • AIRCRAFT MAINTENANCE PARTS AND SERVICE

    Type : Contract

    Due : 30 Jun, 2019 (about 4 years ago)
    Posted : about 6 years ago
    Started : 30 Jun, 2016 (about 7 years ago)

    PISTON 0-3 ENGINE YEAR 1 BRAND: STERLING MODEL: PIPER SUPER CUB 1.000 HOUR N/A $65.00000 LINE# DESCRIPTION/MFGR/BRANDEST QUANTITYUNIT% DISCOUNTUNIT PRICE 00175 COMM CODE:  905-16-088291 [AIRCRAFT AND AIRPORT OPERATIONS SERVICES]   ITEM DESCRIPTION: ALTIMETER SYSTEM CERTIFICATION AND ALTITUDE REPORTING SYSTEM SERVICE HOURLY LABOR RATE PIPER SUPER CUB LYCOMING PISTON 0-3 ENGINE YEAR 1 BRAND: STERLING MODEL: PIPER SUPER CUB 1.000 HOUR N/A $65.00000

    From: New Jersey (State)