Type : Bid Notification
Replace existing oil fired heating system with natural gas heating system for S-2097 and S-2098 at USAG Humphreys, South Korea.
Replace existing oil fired heating system with natural gas heating system for S-2097 and S-2098 at USAG Humphreys, South Korea.
Replace existing oil fired heating system with natural gas heating system in various buildings in accordance with the specifications and drawings. Work performance shall be on USAG Humphreys.
Replace Existing Oil fired Heating System with Natural Gas System at S-12001 and S-12002 at USAG Humphreys
Corrected the first page in the soliciationFrom Title: Repair Pedestrian Access, Drainage, and Pavement, CP CaseyTo Title: Replace oil fired WAF heating system with natural gas heating system at 14 buildings, Camp Caseyc. Uploaded the revised solicitation.
MATOC VENDORS ONLY.SEE ATTACHMENT FOR DETAILS.
Contact Information: Unchong, Cho, Contract Specialist, Phone 05033548079, Email unchong.cho4.ln@mail.mil Office Address :Unit #15289 APO 1 96205-5289 Location: 411TH CSB (W90VN8) RCO CAMP HUMPHREYS Set Aside: N/A
This is a Non-Work Plan Task Order for the follow ing MA IDIQ General Construction Contractors only.Contract W91QVN-18-D-0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0030, 0031, 0032, 0032, 0034, 0035, 0040, 0042, 0043, 0044, 0045, 0046, 0047, 0048, 0049, 0050, 0051, 0052, 0162