Type : Bid Notification
Legibility / Clarity\n\nRFP 24-FIRE-10 Purchase of One (1) or more New/ Unused Class A Pumper Fire Apparatus\n"
Legibility / Clarity\n\nRFP 24-FIRE-10 Purchase of One (1) or more New/ Unused Class A Pumper Fire Apparatus\n"
Town of Merrimack, New Hampshire 6 Baboosic Lake Rd · Merrimack, NH 03054 · www.merrimacknh.gov April 26, 2024 REQUEST FOR BID EV Fire Blanket Sealed bids will be received by the Town of Merrimack until 2:00PM on Tuesday, May 7, 2024 to supply one (1) EV Fire Blanket to the Town of Merrimack’s Fire Department in accordance with the following specifications and conditions:
This Request for Quotations (the “RFQ”) is an invitation by the City of Lethbridge (the “City”) to prospective respondents to submit quotations for Fire Preplan for Lethbridge Fire and Emergency Services, as further described in Section A of the RFQ Particulars (Appendix B) (the “Deliverables”).
This new 2024 Ferrara Fire Equipment will replace Togus VAMC s oldest 2008 Ferrara Fire equipment. Estimated Amount $______________.
The City of Wood Dale will be having an information session regarding the RFP for Fire Sprinkler & Fire Alarm Testing. The session will allow an opportunity to tour facilities and answer any clarifying questions. Info Session: RFP for Fire Sprinkler & Fire Alarm Testing Friday, May 3, 2024 10:00 AM Meet at Public Works Facility, 790 N Central Ave, Wood Dale, IL 60191 RFP - Fire Sprinkler & Fire Alarm Testing
The Correctional Service is looking for a contractor with a license from the Régie du bâtiment du Québec (RBQ) in subcategory 13.3 -Fire extinguishing systems, authorized to install automatic water fire extinguishing systems, fire pipes, connection to the existing aqueduct network, as well as to the existing pipe network and cabinet and in order to perform the work as described in the specification.
Due to an electrical storm it was discovered that some of our fire alarm system components have been damaged due to an electrical strike. The current fire alarm system is an Edwards EST3.The contractor shall be responsible for replacing the damaged components and repairing the fire alarm system. It was determined the following parts at a minimum need to be replaced:1. 3 Power Supplies2. 6 Batteries3. 4 Transceiver Cards4. 3 Fiber Cards