Plans - City Approved.17Dec2020.pdfDocumentationExhibit B1 UMC Northeast Clinic - Oxygen Tanks Plans - City Approved.17Dec2020Feb 9th 2022, 9:53 AM MST - Exhibit B2 UMC East Clinic Oxygen Tank Plans City Approved 17 December 2020.pdfDocumentationExhibit B2 UMC East Clinic Oxygen Tank Plans City Approved 17 December 2020Feb 9th 2022, 9:54 AM MST - EXHIBIT C - Prevailing Wage.docxDocumentationEXHIBIT C - Prevailing WageFeb 9th 2022, 9:54 AM MST
Plans Attachment Mar 31, 2023 Complete Construction of a 2-MG Potable Water Ground Storage Tank Bid Document / Specifications Mar 31, 2023 Complete Distribution Info Bid Bond Yes Plan (blueprint) None eBidding No Distributed By DemandStar Distribution Method Download Distribution Options Bid has no blueprints associated with it Distribution Notes None Publications Vero Beach Press Journal View Legal Ad Pre-Bid Conference NON-MANDATORY A non-mandatory
D-1189 Acid Dilution Tank Replacement (Informal) 01. Exhibit A-DVC Acid Waste Tank Replacement Plans 02. Pre-bid Walk-thru Sign-in Sheet ADDENDUM NO. 1 ADDENDUM NO. 2 11/10/2021 No Award
The Port of Coupeville is seeking proposals for engineering work from interested parties for creating plans for upgraded septic tank design for the Historic Coupeville Wharf located in Coupeville, Washington. Heat trace to tank and pipes Remove and replace the septic tank with a new, larger septic tank and add ventilation. Grease trap moved to new location and added ventilation.
Contract B is also responsible for providing site access, excavation and grading of the tank site to the limits shown on the plans prior to Contract A construction, final site grading and paving.