Search results for: telecommunications room equipment

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 177
  • 2021 Telecommunications Room Equipment and Continuity (TREC) P10

    Type : Bid Notification

    Due : 12 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 20 Sep, 2021 (about 2 years ago)

    Paul International Airport 2021 Telecommunications Room Equipment and Continuity (TREC) P10 Alliiance 00 11 10-1 Notice of Call for Bids – Non-Federal Metropolitan Airports Commission Contract No. 106-2-919 DOCUMENT 00 11 10 NOTICE OF CALL FOR BIDS – NON-FEDERAL METROPOLITAN AIRPORTS COMMISSION (MAC) Airport Location: Minneapolis-St.

    From: Metropolitan Airports Commission ()

  • : USACE SPK DBB Construction - Naval Research Laboratory (NRL) Data Center, Camp Roberts, CA

    Type : Pre-Bid Notification

    Due : 17 May, 2024 (in 17 days)
    Posted : 1 month ago
    Started : 16 Mar, 2024 (1 month ago)

    The Data Center is anticipated to consist of five (5) zones - lobby, office, Telecommunications Equipment Room (TER), receiving, and utility - that will support the Large Antenna Project (LAP) and Small Antenna Project (SAP).

    From: Federal Government (Federal)

  • INVITATION TO SUBMIT AN EXPRESSION OF INTEREST (EOI)

    Type : Bid Notification

    Due : 15 May, 2024 (in 15 days)
    Posted : 2 months ago
    Started : 25 Apr, 2024 (4 days ago)

    A mixed use building may be considered at the sole discretion of PSPC; 2. proposed space must be contiguous and located entirely on one floor; preference may be given to spaces located on the main floor; 3. the dimensions must be compatible for efficient design and use; 4. a dedicated telecommunication/equipment room measuring no less than 9.0 um2 within the proposed space must be provided; this area will not form part of the Lessee’s usable area

    From: Canada (Federal)

  • INVITATION TO SUBMIT AN EXPRESSION OF INTEREST (EOI)

    Type : Bid Notification

    Due : 08 May, 2024 (in 8 days)
    Posted : 11 days ago
    Started : 18 Apr, 2024 (11 days ago)

    ; 5. be fully accessible to persons with a disability; 6. a dedicated telecommunication/equipment room measuring no less than 20 um2 within the proposed space must be provided; this area will not form part of the Lessee’s usable area noted above but will be included in the rentable area calculation; 7. the dimensions of the proposed space must be compatible for efficient design and use; 8. the physical characteristics of the lands and the building

    From: Canada (Federal)

  • Monument Fire Center Telecom Upgrade

    Type : Bid Notification

    Due : 28 May, 2024 (in 28 days)
    Posted : 19 days ago
    Started : 26 Apr, 2024 (3 days ago)

    base course replacement; installation of underground conduit and associated conductors and innerducts for underground power and telecommunication service; demolition of existing telecommunication room and installation of new walls, gypsum board, and painting.iv.

    From: Federal Government (Federal)

  • Communications Infrastructure

    Type : Bid Notification

    Due : 09 Jul, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 28 Jun, 2018 (about 5 years ago)

    The contractor shall provide and install a 24 strand single mode underground Outside Plant (OSP) fiber cable, a 200 pair 24 gauge underground (OSP) copper cable, and the required equipment in a telecommunications room to provide voice and data services. The contractor shall build out a Telecommunications Room; to establish voice and data connectivity per I3A.3.

    From: Federal Government (Federal)

  • Bid 1875 Relocate Utilities - Telecom, De Anza College

    Type : Bid Notification

    Due : 19 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 21 Jun, 2023 (10 months ago)

    RSS 153, MLC117, and VPAC 206 as shown on Architectural Drawing; Power for new rack-mounted equipment in existing Telecom Rooms as shown on Electrical Drawings; Selective demolition of telecommunications cabling and equipment as shown on Telecommunication Drawings; Telecommunications Room alterations and terminations as shown on Telecommunications Drawings.

    From: Foothill-De Anza Community College (Higher Education)