Search results for: terminal ceiling and lighting

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 41
  • EPIA Terminal Ceiling and Lighting Replacement

    Type : Bid Notification

    Due : 14 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 25 Oct, 2022 (18 months ago)

    Annual Contract for Emergency Lights and Accessories for City of San AntonioBid Due: 12/23/2022

    From: El Paso (City)

  • EPIA Terminal Ceiling and Lighting Replacement

    Type : Bid Notification

    Due : 14 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 25 Oct, 2022 (18 months ago)

    Solicitation #:2023-0199Title:EPIA Terminal Ceiling and Lighting ReplacementStatus:OPENDepartment:AirportType:ConstructionDeposit:N/ADate Issued:11/08/22Date scheduled on Agenda:-tbd-Due Date:12/14/2022Contact:Derrick RussellLink:You must be signed-up and signed-onto view or download the specifications of this solicitation. Amendment #Amendment DateAmendment A00111/30/2022You must be signed-up and signed-onto view or download amendments.

    From: El Paso (City)

  • Courthouse Annex Lighting Project

    Type : Bid Notification

    Due : 25 Apr, 2024 (3 days ago)
    Posted : 1 month ago
    Started : 13 Mar, 2024 (1 month ago)

    Work to be performed under this project includes but is not limited to General and HVAC air quality upgrades to existing public health facilities including ceiling repair, ductwork, terminal box, and AHU modifications. When applicable, the County shall obtain all rights of way and easements required for the project unless otherwise specified.

    From: Gwinnett (County)

  • SR525 Mukilteo Ferry Terminal Ferry Terminal Construction (Phase 2), Mukilteo WA

    Type : Bid Notification

    Due : 18 Jul, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 03 Jul, 2018 (about 5 years ago)

    Relites Terminal Glass/Glazing Terminal Fire Suppression Terminal Electrical Terminal HVAC System Terminal Plumbing System Pavement Markings Marine Pile Driving Light Pole Foundations Traffic Signals Station Concrete Station Electrical Station Lighting Fiber/Communications Marine Structural Steel Concrete Pumping Contaminated Material Removal Marine Demolition DBE/SBE Goals and Requirements The project has an Apprenticeship goal of 15% and DBE goal

    From: Washington State Office of Minority and Women (City)

  • GSU- Langdale Hall 4th Floor, Terminal Units, Lights, and Ceiling Replacement

    Type : Bid Notification

    Due : 06 Nov, 2023 (5 months ago)
    Posted : 5 months ago
    Started : 04 Oct, 2023 (6 months ago)

    Buyer Contact: Shruti Acharya sacharya@gsu.edu +1 404-413-3168 Description: Purpose of Procurement Georgia State University (GSU, ¿Using Agency¿), is soliciting Statements of Qualifications from Mechanical Contracting firms interested in providing services for the project known as Project No. 0007-008-24, Langdale Hall 4th Floor, Terminal Units, Lights, and Ceiling Replacement at Georgia State

    From: Georgia (State)

  • Phoenix Sky Harbor T4 Garage Lighting Replacement

    Type : Award

    Due : 25 Sep, 2018 (about 5 years ago)
    Posted : about 4 years ago
    Started : 10 Sep, 2018 (about 5 years ago)

    The proposed work is to replace the existing HPS luminaires in the Terminal 4 Parking Garage, stairwells and roof with new LED luminaires. All existing conduit and conductors are to remain, unless otherwise noted. Most of the fixture types to be replaced are the 'LP'. These ‘LP’ fixtures are specified with a NEMA l7-15P cord, plug, pendant stem, and mounting hook. Fixtures will utilize a wireless networked lighting control system.

    From: Phoenix (City)

  • Domestic Terminal Interior & Fire Life Safety

    Type : Bid Notification

    Due : 08 Dec, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 26 Oct, 2021 (about 2 years ago)

    The DTIE scope includes the replacement of ceilings and lighting in the Domestic Terminal including North and South ticketing halls, bag claim areas, and North/ South circulation corridor. The remaining portions of the Domestic Terminal including security checkpoints, crossovers, the Atrium, other connecting corridors, and the lower-level tunnels are excluded from this portion of the scope.

    From: Georgia (State)