Type : Contract
SERC: MONITOR/TEST ACM AND LEAD ABATEMENTS. Solicitation ID/Procurement Identifier: F11CC10170 Ultimate Completion Date: Sun Oct 31 17:00:00 GMT 2021
SERC: MONITOR/TEST ACM AND LEAD ABATEMENTS. Solicitation ID/Procurement Identifier: F11CC10170 Ultimate Completion Date: Sun Oct 31 17:00:00 GMT 2021
Is there a lead paint report for the buildings? Who is responsible for asbestos and/or lead paint abatement, if any of those areas are to be disturbed during installation?A7. There is a survey, however it is limited to its accuracy. Contractor shall provide a plan for routing and the VA shall conduct tests if necessary for possible ACM and or lead. The Contractor should utilize existing raceways to minimize impact. Q8.
The structures were surveyed for Asbestos Containing Material (ACM) and the tests came back positive, please refer to the Asbestos Survey Report for more information. See Attachment 02 4. Asbestos Containing Material has been removed from the structures by a licensed asbestos abatement contractor and disposed of at a state licensed disposal facility permitted to accept Asbestos Containing Material.
Supplier Name:- ST MARKS FAMILY MEDICINE Buyer:- MMcGaughey
Supplier Name:- EXODUS HEALTHCARE NETWORK PLLC Buyer:- EPavelka
Supplier Name:- HEALTH CLINICS OF UTAH Buyer:- EPavelka