Type : Contract
REPAIRS AND TESTING FOR DRY SUITS Solicitation ID/Procurement Identifier: 70Z04523PKODI0032 Ultimate Completion Date: Fri Mar 31 17:00:00 GMT 2023
REPAIRS AND TESTING FOR DRY SUITS Solicitation ID/Procurement Identifier: 70Z04523PKODI0032 Ultimate Completion Date: Fri Mar 31 17:00:00 GMT 2023
DEVELOPMENT OF A LASER-BASED TESTING PLATFORM FOR GENERIC DRY POWDER. Solicitation ID/Procurement Identifier: FDABAA-23-0123 Ultimate Completion Date: Sat Sep 20 17:00:00 GMT 2025
Central Receiving and Send-Out Department at the facility sends out many specimens to different Reference Laboratories for Testing and Dry Ice is required to maintain the appropriate temperatures during the transport of the specimen. Dry Ice is created by cooling and pressurizing CO2 gas until it changes to a solid state. Dry Ice is solidified Carbon Dioxide CO2 available in blocks or pellets.
The Centers for Disease Control and Prevention (CDC) intends to award a sole source firm fixed price purchase order to Remel Inc. for their Custom-manufactured Dry antimicrobial testing plates.This contract action is for products for which the Government intends to solicit and negotiate with only one source under the authority of FAR 8.405-6 and 10 U.S.C. 2304(c)(1).
MA Dry Gases Implied Consent for Breath Alcohol Testing RFB - 048 - 20000000635 Summary Forensic Sciences Maria Green General Request for Bids(RFB) Published On : 10/30/19 Amended On : Closing On : 11/26/19 5:00 PM CST Time Left: 21 Days, 19:21:29 Intent Posted On: Open
Background: The Hudson Valley Healthcare System (HVHCS) Fire Department (FD) in Montrose, New York is currently seeking a mandatory dry pipe sprinkler inspection test. Currently, the VA FD at HVHCS has five (5) buildings with 12 systems in need for a mandatory dry pipe sprinkler inspection test in accordance with IAW NFPA 25. The test for dry pipe sprinkler testing is required every three (3) years.
OHSU seeks proposals from firms interested in entering into a Prime Agreement for Fire Sprinkler contractors in the following areas: • Five-year internal pipe inspections • Five-year FDC flushes • Five-year wet stand pipe testing • Five-year dry stand pipe testing • Five-year Pressure Reducing Valve (PRV) testing • Ten-year dry barrel sprinkler head replacement • Routine and emergency repairs • Assist with specialty systems such as helipad foam system