Search results for: thickness and tightness testing

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 19
  • Tank System And Associated Piping Thickness And Tightness Testing

    Type : Bid Notification

    Due : 27 May, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 20 May, 2020 (about 3 years ago)

    The objective of this contract is to conduct thickness and tightness testing on the Chemical Transfer Facility (CTF) and Munitions Assessment And Processing System (MAPS) storage tanks and piping and received the resulting report.

    From: Federal Government (Federal)

  • Tank System And Associated Piping Thickness And Tightness Testing at the CTF and MAPS Facilities

    Type : Bid Notification

    Due : 07 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Feb, 2022 (about 2 years ago)

    The objective of this contract is to conduct thickness and tightness testing on the Chemical Transfer Facility (CTF) storage tanks and piping, conduct formal external inspections of the tanks, a formal visual inspection and hydrostatic testing of the piping system at the Munitions Assessment And Processing System (MAPS), and received the resulting reports.

    From: Federal Government (Federal)

  • Tank System and Associated Piping Thickness and Tightness Testing

    Type : Award

    Due : N/A
    Posted : about 6 years ago
    Started : 30 Apr, 2018 (about 6 years ago)

    Notice of Award to InterSpec, LLC.

    From: Federal Government (Federal)

  • A--Petroleum Oil Lubricants (POL) Fuel Tank Inspection and CleaningRemote Operated Vehicle (ROV)

    Type : Bid Notification

    Due : 12 Jan, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 27 Nov, 2017 (about 6 years ago)

    Testing of Existing Underground Fuel Systems UFGS 33 65 00 Cleaning Petroleum Storage Tanks UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks UFGS 09 97 23.13 Interior Lining For Concrete Storage Tanks ABSTRACT SUBMITTALS TO THIS BAA CAN BE MADE USING THE ABSTRACT FORM.

    From: Federal Government (Federal)

  • CWSRF Project Battery B Grit and Primary Settling Tanks – Specs Vol. 2

    Type : Bid Notification

    Due : 22 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 07 Jul, 2021 (about 2 years ago)

    Testing Equipment: 1. Provide magnetic type dry film thickness gauge to test coating thickness specified in mils, as manufactured by Nordson Corp., Anaheim, CA, Mikrotest. 2.

    From: Flint (City)

  • A--Petroleum Oil Lubricants (POL) Fuel Tank Inspection and Cleaning Remote Operated Vehicle (ROV)

    Type : Pre-Bid Notification

    Due : 12 Jan, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 27 Nov, 2017 (about 6 years ago)

    Testing of Existing Underground Fuel Systems UFGS 33 65 00 Cleaning Petroleum Storage Tanks UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks UFGS 09 97 23.13 Interior Lining For Concrete Storage Tanks ABSTRACT SUBMITTALS TO THIS BAA CAN BE MADE USING THE ABSTRACT FORM.

    From: Federal Government (Federal)

  • Shipyard Overhaul S/V H.R. SPIES

    Type : Bid Notification

    Due : 06 Jul, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 27 Jun, 2018 (about 5 years ago)

    maintain original strength.All watertight, oil tight and weather tight work shall be tested for tightness prior to painting.

    From: Federal Government (Federal)