Type : Bid Notification
Repair 1000 Ton Cooling Tower Location Colorado Publication Date 03/17/2020 Closing Date 04/07/2020 03:00 PM MDT
Repair 1000 Ton Cooling Tower Location Colorado Publication Date 03/17/2020 Closing Date 04/07/2020 03:00 PM MDT
REFURBISHMENT OF 125 TON COOLING TOWER AT FEDERAL CENTER SOUTH, SEATTLE, WA Solicitation ID/Procurement Identifier: 47PL0218D0017 Ultimate Completion Date: Tue Aug 31 17:00:00 GMT 2021
INVITATION TO BID RQ4316- 160 TONS COOLING TOWER Bid Number: 20008-RQ4316 Date Issued: 04/13/2022 Bid Open Date/Time: 04/28/2022 11:00:00 AM CT Original: https://wwwcfprd.doa.louisiana.gov/osp/lapac/agency/pdf/7850800.pdf
Includes 6-month Rental (900 ton) Cooling Tower with tie into Condenser Water System at the Cooling Tower Yard. Crane service, lifts, and scaffolding needed are included. Operational testing and vibration analysis included. All Cooling Tower Equipment/Materials/Installation as per Engineering Standard ES-2019-001, VHA Construction Spec Section 23 65 00 Cooling Towers, and HVAC Design Manual Rev. Nov 1, 2023.
water cooled chiller, and 1000- ton cooling tower per month, for approximately 4 months.Site Visit is required.Telephone responses will not be accepted.
AWARD NOTICE: This was a short notice/urgent requirement for 250-Ton Portable Cooling Tower for Bldg 2007 at Ft. Sam Houston Texas, sole sourced to Aggreko, LLC. A Single Source Justification (SSJ) is included supporting this award.
Removal and replacement of the existing closed-loop, 56 tons cooling tower with a new Direct replacement closed-loop, model number BAC CCT NS- BAC VFL-036-32M. All exterior piping is to be heat-traced and insulated with metal jackets. Work also may include minor alterations to the existing concrete pad as well as all associated piping and electrical requirements.