Type : Bid Notification
Work will include site work, construction of the ATCT and TRACON/base building, parking lot, perimeter fence, and a new Fiber Optic Transmission System (FOTS) crossing multiple taxiways on the Air Operations Area. The ATCT shaft and base building will be clad with a non-combustible, aluminum plate pressure-equalized rainscreen system.