Search results for: towers ae design

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 152
  • AE DESIGN FOR WATER TOWERS - TUSKEGEE AL

    Type : Contract

    Due : 21 Feb, 2028 (in about 3 years)
    Posted : 13 months ago
    Started : 22 Feb, 2023 (13 months ago)

    AE DESIGN FOR WATER TOWERS - TUSKEGEE AL Solicitation ID/Procurement Identifier: 36C24722R0110 Ultimate Completion Date: Mon Feb 21 18:00:00 GMT 2028

    From: Federal Procurement Data System (Federal)

  • REPLACE COOLING TOWERS AE DESIGN, PROJECT 526-19-132

    Type : Contract

    Due : 30 Sep, 2025 (in 18 months)
    Posted : about 3 years ago
    Started : 29 Jun, 2020 (about 3 years ago)

    REPLACE COOLING TOWERS AE DESIGN, PROJECT 526-19-132 Solicitation ID/Procurement Identifier: 36C24219R0062 Ultimate Completion Date: Tue Sep 30 17:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • C1DA--626-24-203 - AE Upgrade Cooling Tower and Chiller

    Type : Pre-Bid Notification

    Due : 19 Dec, 2023 (3 months ago)
    Posted : 4 months ago
    Started : 20 Nov, 2023 (4 months ago)

    Design work includes but not limited to professional design services of Mechanical, Plumbing, Electrical, Structural, Architectural and Industrial Hygiene.

    From: Federal Government (Federal)

  • NCP Geothermal Conversion 2025

    Type : Bid Notification

    Due : 10 Jan, 2023 (14 months ago)
    Posted : 16 months ago
    Started : 01 Dec, 2022 (16 months ago)

    (°F) Install Year 1 Armstrong Primary Hot Water 14,700 1630 122 140 2015 2 Armstrong Primary Hot Water 14,700 1630 122 140 2015 Total - - 29,400 - The North Chiller Plant’s cooling towers are stainless steel, crossflow Baltimore Air Coil. Three of the four cooling tower cells for the West Towers were installed in 2000, while the fourth was installed in 2002. The four cooling tower cells for the East cooling tower were installed in 2007.

    From: Ohio Facilities Construction Commission (State)

  • C1NB--520-23-2-7080-0002, The Architect Engineer (A/E) to provide services for preparation of design development documents, specifications, working drawi...

    Type : Bid Notification

    Due : 10 Jan, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 08 Dec, 2022 (15 months ago)

    Additionally, FAR 52.236-22 Design Within Funding Limitations, will be applicable to this procurement action. Design limitation costs will be provided to the most highly qualified AE firm selected to complete the design. The magnitude of construction (not design) of this project is between $20,000,000.00 and $50,000,000.00. 1. SELECTION CRITERIA: The selection criteria for this acquisition are listed below.

    From: Federal Government (Federal)

  • C--A/E Design Project No. 667-18-119 Upgrade Water Distribution System, Main Hospital for the Overton Brooks VA Medical Center, Shreveport, LA

    Type : Bid Notification

    Due : 25 Jan, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 12 Dec, 2017 (about 6 years ago)

    The AE design team shall: Perform site investigations necessary to design a secondary water treatment system(s) for enhanced control of the Chlorine and biocide levels throughout the main hospital, water storage tanks and cooling towers (all HW and CW systems).

    From: Federal Government (Federal)

  • AE Service for Rutland MMTC Repairs

    Type : Bid Notification

    Due : 17 Jan, 2023 (14 months ago)
    Posted : 16 months ago
    Started : 02 Jan, 2023 (15 months ago)

    See photo S32. 4.9 Stair Towers The garage has stair/elevator towers located at the North, South and West elevations. See Figure 1. The stair/elevator towers are constructed out of precast concrete. All the stair/elevator towers are in good condition.

    From: Vermont (State)