Type : Award
14 4/5/2024 40-80500-23-17066 AD DELINEATORS AND CHANNELIZING DEVICES CAMINOVERDE II LP SHUR-TITE PRODUCTS, HUTTO, TX - -
14 4/5/2024 40-80500-23-17066 AD DELINEATORS AND CHANNELIZING DEVICES CAMINOVERDE II LP SHUR-TITE PRODUCTS, HUTTO, TX - -
13 4/5/2024 40-80500-23-17066 AC DELINEATORS AND CHANNELIZING DEVICES SAN BAR CONSTRUCTION CORP 9101 BROADWAY BLVD SE, ALBUQUERQUE, NM - -
OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 6 OF 24 PAGES SPE4A7-24-T-266J SECTION B PR: 7007139768 NSN/MATERIAL:1560011741928 ITEM DESCRIPTION HOUSING,PYLON HOUSING,PYLON RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:
OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 8 OF 26 PAGES SPE4A7-24-U-0496 SECTION B PR: 1000185320 NSN/MATERIAL:1560014920056 ITEM DESCRIPTION PYLON SECTION,AIRCR PYLON SECTION,AIRCR RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:
Previous pylons are at the location and may be used if the bidder¿s design incorporates them, but it is not required. If the pylons are unutilized, they will remain in the water. A concrete approach walk ramp exists and should be utilized in the design for access purposes.
Proposed procurement for NSN 1560014920056 PYLON SECTION,AIRCR: Line 0001 Qty 10 UI EA Deliver To: By: 0197 DAYS ADO This Solicitation may result in an Automated IDC (Indefinite Delivery Contract). The term of the contract/order will be one year or until the aggregate total of orders placed against the contract/order reach 250000.00. The estimated number of orders per year is 3. The Guaranteed Minimum quantity will be 1.
The proposal should include 2 operators per truck, screens to catch debris at the discharge side of the manholes, traffic control w/sign package, traffic cones and all required safety measures per state of New Hampshire guidelines. Responders will provide reports (1 hardcopy and 1 digital) of completed work including recommended repairs to sewer mains and manholes.