Type : Bid Notification
Scope of Services It is the intent of this specification to make a purchase for the installation of Traffic Signal Pole Foundations of various sizes for the City of Grand Prairie Transportation & Mobility Department.
People also searched for
Scope of Services It is the intent of this specification to make a purchase for the installation of Traffic Signal Pole Foundations of various sizes for the City of Grand Prairie Transportation & Mobility Department.
Bid Number:24120-AG Bid Title:Traffic Signal Poles Category:Purchasing Bid Board PostingStatus:Open Description: The purpose for this Request for Quotation (RFQ) is to select one vendor to furnish and deliver one (1) steel traffic signal pole and mast arm for installation by the City as an emergency signal for Fire Station #10 located at 4869 Bennetts Pasture Road, Suffolk, Virginia for the Department of Public Works, Traffic Engineering Division.
Bid Number:FB24279 Bid Title:Traffic Signal Upgrade Category:Formal BidsStatus:Open Publication Date/Time: 4/16/2024 4:00 PM Closing Date/Time: 5/1/2024 3:00 PM Contact Person: Darren Redfield: darrenmr@cityofws.org Related Documents: Ad-Traffic Signal Upgrade FB24279 Return To Main Bid Postings Page
Info Items B2B Issued By: Roanoke City Government Opportunity Type: Invitation for Bids (IFB) Category: Non-professional Services - Non-Technology Work Location: Roanoke, VA Website: Summary: RFQ 24-03-101 Traffic Signal Controller Cabinet DocumentsRFQ 24-03-101 Traffic Signal Controller Cabinet.pdfDocumentsDocumentSizeDescriptionPosted OnType RFQ 24-03-101 Traffic Signal Controller Cabinet.pdf(768.58 KB)RFQ 24-03-101 Traffic Signal Controller Cabinet4
ITB Traffic Signal and Streetlight Maintenance (OM2403) 05/02/2024 prior to 10:00 AM 04/11/2024
ITB Traffic Signal and Streetlight Maintenance (OM2403) 05/02/2024 prior to 10:00 AM 04/11/2024
Description: Description:This project includes traffic signal modifications at each intersection along with sidewalk, curb and gutter, ADA improvements, pavement marking and final restoration as well as incidental and collateral work necessary to complete the project as shown on the plans.