Search results for: transfer pumps replacement

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 99
  • ECR Effluent Transfer Pumps Replacement

    Type : Bid Notification

    Due : 14 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 07 Nov, 2022 (17 months ago)

    The East Central Regional Wastewater Treatment Facilities Board (ECR), through its agent, the City of West Palm Beach (City), is accepting bids from qualified and responsible Contractors to furnish and assume full responsibility for all labor, material, construction, equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit to perform Effluent Transfer Pumps Replacement Project....

    From: West Palm Beach (City)

  • Sludge Transfer Pump Replacement

    Type : Bid Notification

    Due : 17 Dec, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 06 Dec, 2019 (about 4 years ago)

    Johns County - Purchasing Department Bid Type Single Source Bid Number SS-SS 20-16-0-2020/DP Fiscal Year 2020 Bid Writer David Pyle Bid Name Sludge Transfer Pump Replacement Bid Status Awarded Bid Status Text Awarded to Carl Eric Johnson, Inc.

    From: St. Johns (County)

  • RFQ #2024-01 -Surface Water Treatment Plant Rehabilitation Phase I

    Type : Bid Notification

    Due : 26 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 09 Oct, 2023 (6 months ago)

    Phase I design portion includes chlorine dioxide system improvements, chemical metering pump replacements, chemical transfer pump replacements, and chemical piping replacement.

    From: Sugar Land (City)

  • Everest Water Reclamation Facility Transfer Pump Pad Replacement

    Type : Bid Notification

    Due : 08 Feb, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 20 Dec, 2017 (about 6 years ago)

    Electrical upgrades to the existing 16” vertical turbine effluent transfer pumps (#5 & #6) and the electrical upgrades to the new 16” vertical turbine effluent transfer pumps (#1 - #4) to include, but not limited to, the replacement and installation of new disconnect switches, replacement and installation of new conduit, conduit fittings, all wiring for the effluent transfer pumps and pressure switches, grounding improvements and all other related

    From: Cape Coral (City)

  • Estherville, City of Phosphorus Removal Improvements 2023 0M2.126161

    Type : Bid Notification

    Due : 14 Nov, 2023 (5 months ago)
    Posted : 5 months ago
    Started : 26 Oct, 2023 (6 months ago)

    Chemical phosphorus removal process includes five (5) chemical metering pumps, two (2) chemical storage tanks, and chemical piping to four (4) points of injection. 2. Primary sludge pump replacement. 3. Rotary drum thickener replacement. 4. Rotary drum thickener feed tank replacement. 5. Thickener feed and thickened sludge transfer pumps replacement. 6. Sludge thickener room HVAC system upgrade. 7.

    From: Bolton and Menk (Co-op)

  • City of Port Lavaca - Lynn's Bayou Wastewater Treatment Plant Improvements

    Type : Bid Notification

    Due : 14 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 29 Nov, 2022 (17 months ago)

    Details ID: 60659778 Estimate: Type: Installation of blowers in a new building, sludge transfer pump replacement, grit classifier replacement and associated work at the Wastewater Treatment Plant. Owner: City of Port Lavaca Location Calhoun County, TX Map Code: Show Google Map Open Map On Google No Map Scope Pre-Bid Details Date: 12/07/2022 Time: 2:00 PM Location: at the Lynn's Bayou Wastewater Treatment Plant, 800 N.

    From: Aecom Houston (Other)

  • Source Water Facility Biologically Active Filters Improvements

    Type : Bid Notification

    Due : 16 Nov, 2023 (5 months ago)
    Posted : 8 months ago
    Started : 27 Aug, 2023 (8 months ago)

    , backwash air scour blower, air supply system, lake transfer pump replacement and piping modifica ......

    From: Marco Island (City)