Search results for: transmission line

Showing opportunity 1 - 10 of 2,128
  • Vail Tortilita Transmission Line Rebuild Project

    Type : Bid Notification

    Due : 03 May, 2024 (in 5 days)
    Posted : 5 days ago
    Started : 22 Apr, 2024 (5 days ago)

    Conductors and Line hardware for Vail-Tortolita Transmission Line Rebuild Project in support of Western Area Power Administration Desert Southwest Region

    From: Federal Government (Federal)

  • Vail Tortolita Transmission Line Rebuild Project

    Type : Bid Notification

    Due : 03 May, 2024 (in 5 days)
    Posted : 3 days ago
    Started : 24 Apr, 2024 (3 days ago)

    Description Conductors and Line hardware for Vail-Tortolita Transmission Line Rebuild Project in support of Western Area Power Administration Desert Southwest Region Overview Reference number: 89503124QWA000289 Issue date: 04/24/2024 Response due: 05/03/2024 07:00 PM US/Eastern Set Aside: Total Small Business Set-Aside (FAR 19.5) NAICS: 335999-All Other Miscellaneous Electrical Equipment and Component Manufacturing PSC / FSC: 6145-WIRE AND CABLE,

    From: FedConnect (Federal)

  • Vail-Tortolita Double-Circuit 230-kV Transmission Line Rebuild Synopsis

    Type : Bid Notification

    Due : 16 May, 2024 (in 18 days)
    Posted : 3 months ago
    Started : 22 Apr, 2024 (5 days ago)

    Ammendment 0002 : Questions and Answers to date 4/22/2024 and Site Visit Sign-In SheetVail-Tortolita Double-Circuit 230-kV Transmission Line Rebuild Solicitation.

    From: Federal Government (Federal)

  • Creston-Maryville 161 kV Transmission Line Reconductor IA/MO

    Type : Pre-Bid Notification

    Due : 10 May, 2024 (in 12 days)
    Posted : 1 month ago
    Started : 26 Mar, 2024 (1 month ago)

    Western Area Power Administration has a requirement for a contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of Creston – Maryville 161-kV Transmission Line Re-conductor in Iowa/Missouri. The principal components of the work involve demolition, miscellaneous site-work, providing transmission line poles, and reconductoring 62.3 miles of existing transmission line.

    From: Federal Government (Federal)

  • Supply Transmission Line Monitoring Equipment as Specified - St. John's, NL

    Type : Bid Notification

    Due : 03 May, 2024 (in 5 days)
    Posted : 1 day ago
    Started : 10 Apr, 2024 (16 days ago)

    Bid Classification: Goods Bid Type: Public Tender Bid Number: 98382 VC Bid Name: Supply Transmission Line Monitoring Equipment as Specified - St.

    From: Newfoundland Labrador Hydro (Other)

  • 115 kV Transmission Line Construction Scottsbluff to Victory Hill Substation and Kearney Tower to TechOne Substation

    Type : Bid Notification

    Due : 01 May, 2024 (in 3 days)
    Posted : 8 days ago
    Started : 13 Mar, 2024 (1 month ago)

    The Nebraska Public Power District (DISTRICT) intends to procure all labor, supervision, materials, tools, apparatus, equipment, conveyances, mobilization, and demobilization necessary for completing all work associated with the installation and construction of the Scottsbluff to Victory Hill and Kearney Tower to TechOne 115 kV transmission line projects in accordance with the Drawings and Specifications, performance bond and all other requirements

    From: Nebraska Public Power District (Utilities)

  • Oakland Transmission Line Steel Structures

    Type : Bid Notification

    Due : 02 May, 2024 (in 4 days)
    Posted : 9 days ago
    Started : 17 Apr, 2024 (10 days ago)

    RFB Request for Bid A sealed written request made to prospective suppliers requesting submission of a bid for goods or services. Advertised. Sealed bids have a state mandated dollar level. NO FAXED OR EMAILED BIDS! All documents (forms) herein and attached are required to be completed and returned with response. All questions must be answered in the Ion Wave Question & Answer segment.

    From: Garland (City)