Search results for: treatment facility paving

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 60
  • IFB#20227034 - WA19C – Eastside Water Treatment Facility Paving Project

    Type : Bid Notification

    Due : 06 Feb, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 10 Jan, 2023 (15 months ago)

    Project Title IFB#20227034 - WA19C – Eastside Water Treatment Facility Paving Project Invitation # IFB#20227034 Bid Posting Date 01/10/2023 9:14 AM (PST) Project Stage Bidding Bid Due Date 02/06/2023 10:00 AM (PST) Response Format Electronic Project Type Bid Response Types Line Items General Attachment Type of Award Lump Sum Categories 236210 - Industrial Building Construction 237310 - Highway, Street, and Bridge Construction 237990 - Other Heavy

    From: Chino (City)

  • IFB 24-141-0939 Northwest River Park Ranger Station

    Type : Bid Notification

    Due : 07 May, 2024 (in 3 days)
    Posted : 26 days ago
    Started : 05 Apr, 2024 (27 days ago)

    Summary: The Work under this Project consists of demolition of the existing ranger station and activity building and replacement thereof with a new combined ranger station and activity building and outdoor deck area, including (without limitation) new waterline connection, new onsite lift station and septic tank, micro-bioretention facilities for stormwater treatment, rehabilitation of existing dry fire hydrant, paving, parking, and pedestrian connectivity

    From: Virginia (State)

  • City of Vancouver - NE 137th Ave Corridor

    Type : Bid Notification

    Due : 19 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 14 Feb, 2024 (2 months ago)

    The Project includes clearing and grubbing, roadway excavation, stormwater conveyance, treatment, detention facilities, paving with HMA and/or concrete, irrigation systems, erosion control, curb/gutter, walls, sidewalk, traffic control, pavement marking, illumination system, and landscaping and other work. The work shall be physically complete within 390 working days from the notice to proceed. This is Prevailing Wages.

    From: Washington State Office of Minority and Women (State)

  • City of Vancouver - NE 137th Ave Corridor

    Type : Bid Notification

    Due : 19 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 14 Feb, 2024 (2 months ago)

    The Project includes clearing and grubbing, roadway excavation, stormwater conveyance, treatment, detention facilities, paving with HMA and/or concrete, irrigation systems, erosion control, curb/gutter, walls, sidewalk, traffic control, pavement marking, illumination system, and landscaping and other work. The work shall be physically complete within 390 working days from the notice to proceed. This is Prevailing Wages.

    From: Ben Franklin Transit (Transportation)

  • NE 137th Avenue Corridor Completion - City of Vancouver

    Type : Bid Notification

    Due : 05 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 01 Feb, 2024 (3 months ago)

    The Project includes clearing and grubbing, roadway excavation, stormwater conveyance, treatment, detention facilities, paving with HMA and/or concrete, irrigation systems, erosion control, curb/gutter, walls, sidewalk, traffic control, pavement marking, illumination system, and landscaping and other work. The work shall be substantially completed: 390 WORKING DAYS. Wages are Prevailing Wages.

    From: Ben Franklin Transit (Transportation)

  • Pavement milling, hot asphalt overlay with drainage and safety improvements, and other incidental work.

    Type : Bid Notification

    Due : 08 May, 2024 (in 4 days)
    Posted : 15 days ago
    Started : 24 Apr, 2024 (9 days ago)

    5/8/2024 026005.10, 026005.20 & 026280.00 South Portland Pavement milling, hot asphalt overlay with drainage and safety improvements, and other incidental work. 4/24/2024

    From: MaineDOT (Transportation)

  • Pavement milling, hot asphalt overlay with drainage and safety improvements, an

    Type : Bid Notification

    Due : 08 May, 2024 (in 4 days)
    Posted : 15 days ago
    Started : 24 Apr, 2024 (9 days ago)

    5/8/2024 026005.10, 026005.20 & 026280.00 South Portland Pavement milling, hot asphalt overlay with drainage and safety improvements, and other incidental work. 4/24/2024

    From: Maine Department of Transportation (State)