Search results for: trench drain

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 704
  • IFB 24-2469 TERMINAL DRIVE TRENCH DRAIN & CONCRETE REPAIR

    Type : Bid Notification

    Due : 23 May, 2024 (in 20 days)
    Posted : 7 days ago
    Started : 23 Apr, 2024 (9 days ago)

    Documents24-2469 Terminal Drive Trench Drain & Concrete Repair - IFB Plans [04-22-2024].pdf24-2469 Terminal Drive Trench Drain and Concrete Repair - IFB Document [04-23-2024].pdfDocumentsDocumentSizeDescriptionPosted OnType 24-2469 Terminal Drive Trench Drain & Concrete Repair - IFB Plans [04-22-2024].pdf(13.62 MB)DRAWING4/23/24RFx Document 24-2469 Terminal Drive Trench Drain and Concrete Repair - IFB Document [04-23-2024].pdf(1.58 MB)IFB 24-2469

    From: Virginia (State)

  • Trench Drain

    Type : Bid Notification

    Due : 22 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Oct, 2021 (about 2 years ago)

    KB) Lot 0 1.Trench Drain 16' in length Quantity: 1 each, By: 12/10/21 More Ship To 1851 Rippon Blvd Woodbridge, VA 22191 US Attention: Prince William County Service Authority Product Specs NIGP Code: 21031 Drains, Parts and Accessories Vendor Part Number: Brand Name: No Comments: PLEASE SEE THE TRENCH DRAIN WITH SPECS.

    From: Virginia (State)

  • Trench Drain Replacement

    Type : Bid Notification

    Due : 16 Aug, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 17 Jul, 2023 (9 months ago)

    Bid Details Planholder Trench Drain Replacement Active Browse Awarded Bids Download Bid Package Bid Details Agency Name City of Sun Prairie Bid Writer Kelly Bowles Bid ID RFB-23-BM32-0-2023/KB Bid Type RFB - Request for Bid Broadcast Date 07/17/2023 3:21 PM Central Fiscal Year 2023 Due Date 08/16/2023 2:00 PM Central Bid Status Text None Additional Registration (NEW) NONE Scope of Work Remove and replace existing trench drain and associated components

    From: City of Sun Prairie (City)

  • TRENCH DRAIN AND SUMP PUMP DESIGN INSTALLATION

    Type : Contract

    Due : 28 Sep, 2026 (in about 2 years)
    Posted : 7 months ago
    Started : 29 Sep, 2023 (7 months ago)

    TRENCH DRAIN AND SUMP PUMP DESIGN INSTALLATION Solicitation ID/Procurement Identifier: 2031ZA22D00018 Ultimate Completion Date: Mon Sep 28 17:00:00 GMT 2026

    From: Federal Procurement Data System (Federal)

  • Trench Drain Replacement

    Type : Bid Notification

    Due : 05 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 15 Feb, 2024 (2 months ago)

    Per the specs (Addendum 1) , page 9 it states “Repaint traffic lines along with other fading traffic lines with the Sherwin Williams product MACROPOXY 646 and topcoat with Sherwin Williams Armoseal HS Polyurethane Floor Enamel per manufacturer’s instructions.” It is also noted on Drawing 2A and 3A item 2 in the “General Trench Drain System Removal Notes” Only the freshly painted traffic lines are to have the topcoat applied. 2.

    From: Rhode Island (State)

  • Trench Drain Replacement

    Type : Bid Notification

    Due : 05 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 08 Feb, 2024 (2 months ago)

    Environmental Data Sheet, and Safety Data Sheet Simple Green Concrete and Driveway Cleaner Spilpro Weld-O-Bond Trench Drain Layouts Drawings Sheet 1A Site Location Map Sheet 1A Site Location Map Sheet 2 Demolition – Removal of Trench Drain Sheet 2A Demolition – Removal of Trench Drain Sheet 3 Proposed Trench Drain Layout Sheet 3A Proposed Trench Drain Layout Sheet 4 Power Drain Cross Section Detail Sheet 4A Power Drain Cross Section Detail Sheet 5

    From: Rhode Island (State)

  • PWSC Trench Drain Reconstruction

    Type : Bid Notification

    Due : 02 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 11 May, 2020 (about 4 years ago)

    A portion of existing floor around each new segment will be removed and reconstructed to allow for excavation and construction of new trench drains. The remaining length of original drains will be infilled with concrete. The project also includes approximately 600 linear feet of floor joint reconstruction, 400 linear feet of joint overcutting, and 3,150 linear feet of joint filling in the Service Center, Shop Area, and Cold Storage Building.

    From: Olmsted County (County)