Type : Bid Notification
The Trout Brook Trail Phase 6 project calls for the construction of a 10’ wide bituminous concrete path along the east bank of Trout Brook between Fern Street and Duffield Drive.
The Trout Brook Trail Phase 6 project calls for the construction of a 10’ wide bituminous concrete path along the east bank of Trout Brook between Fern Street and Duffield Drive.
Title: DBE Contracting Opportunity - D263666 Trout Brook Culvert Replacement Agency: Issue Date: 01/29/2018 Due Date: 02/08/2018 Location: Town of Springfield Category: Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Ad Type: Contractor Ads
FCNRCD seeks the services of a qualified engineering firm to prepare a dam removal feasibility report detailing options and preliminary cost estimates to improve fish passage at the Trout Brook Reservoir Dam Site in the middle reaches of the Missisquoi River. This report package should be completed by June 1st, 2023.
Oswego RA # 12, Trout Brook S.F.; Stands A-24, 29, 30.2, 32, 35, 38, 39 Agency: Environmental Conservation, NYS Department of Category:Miscellaneous - Consulting & Other Services Issue Date:12/05/2022 Due Date: 01/19/2023 Ad Type:General
Lawrence County will accept sealed bids for: (2023-24) Replacement of County Road 35 (Slab City) (BIN 3341700) over Trout Brook, Town of Potsdam, St. Lawrence County, PIN 7753.94, D040929 The Owner is St. Lawrence County, and the work site is located in the Town of Potsdam.
Lawrence County will accept sealed bids for: (2023-24) Replacement of County Road 35 (Slab City) (BIN 3341700) over Trout Brook, Town of Potsdam, St. Lawrence County, PIN 7753.94, D040929 The Owner is St. Lawrence County, and the work site is located in the Town of Potsdam.
North Tower Road Over Tributary Trout Brook Agency: New York State Contract Reporter Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:07/31/2020 Due Date: 08/07/2020 Ad Type:Contractor Ads