Search results for: truss replacement

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 68
  • Lakefront Footbridge Steel Truss Replacement

    Type : Bid Notification

    Due : 05 Jul, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 21 Jun, 2022 (22 months ago)

    Jul 5, 2022 11:30:00 AM (local time) Town of Ajax Reference: T22022 Prequalification required: No Lakefront Footbridge Steel Truss Replacement Reference: RFT No.

    From: Ontario Public Buyers Association (Co-op)

  • Overhead Sign Truss Replacement on I-20 in Vicksburg, known as Federal Aid Project No. STP-0020-01(247) / 107787301 in Warren County.

    Type : Bid Notification

    Due : 24 Sep, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 27 Aug, 2019 (about 4 years ago)

    Proposal information tableDate Generated:08/27/2019Sections: 1 Date Revised: Amendments: 0Call Order: 07 Highway Number: 20 Items: 7 Counties: WARREN (75) Project ID: STP-0020-01(247)/107787301

    From: Mississippi Department of Transportation (Transportation)

  • DEL-CR163-4.31 Warrensburg Road Bridge Rehabilitation PID 109063 - Delaware County REBID

    Type : Bid Notification

    Due : 21 May, 2024 (in 16 days)
    Posted : 1 day ago
    Started : 18 Apr, 2024 (16 days ago)

    DEL-CR163-4.31 Warrensburg Road Bridge Rehabilitation PID 109063 - Delaware County REBID Rehabilitation of the 231 Ft ex. two-span pony-truss bridge including replacement of ex. bridge deck, and regalvanizing or replacement or stringers, and repair/regalvanizing of floor beams. To include misc. roadway work associate rehabilitation work. 05/21/2024 02:00 PM UTC

    From: Delaware (County)

  • Overhead Sign Truss Replacement on I-20 in Vicksburg, known as Federal Aid Project No. STP-0020-01(247) / 107787301 in Warren County.

    Type : Bid Notification

    Due : N/A
    Posted : about 4 years ago
    Started : 31 Mar, 2020 (about 4 years ago)

    Proposal information tableDate Generated:03/31/2020Sections: 1 Date Revised: Amendments: 0Call Order: 04 Highway Number: 20 Items: 7 Counties: WARREN (75) Project ID: STP-0020-01(247)/107787301

    From: Mississippi Department of Transportation (Transportation)

  • Angus L. Macdonald Bridge Pier H1 Bearing Replacement

    Type : Bid Notification

    Due : 05 Mar, 2024 (2 months ago)
    Posted : 2 months ago
    Started : 08 Feb, 2024 (2 months ago)

    Macdonald Bridge Pier H1 Bearing Replacement Project Description :Bearing replacement for the truss bearings at Pier H1. Wind guide plate replacement at both Main Towers. Contact Information :-Grant Kelly gkelly@hdbc.ns.ca

    From: MerX (Federal)

  • ARRC RFP 21-08-208877 BIRD CREEK PONY TRUSS BRIDGE REPLACEMENT CONSTRUCTION MANAGER – GENERALCONTRACTOR CM/GC

    Type : Bid Notification

    Due : 30 Jun, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 23 Apr, 2021 (about 3 years ago)

    The Alaska Railroad Corporation (ARRC) is accepting proposals from entities (Offerors) interested in providing Construction Manager / General Contractor (CM/GC) services for a railroad infrastructure improvement Project at ARRC MP 86.6. The structure is located on ARRC’s main line connecting the ports of Seward and Whittier with Anchorage. The structure is located within the Municipality of Anchorage on the railroad’s Kenai Subdivision between Seward and Anchorage, approximately 28 miles south of downtown Anchorage. Proposals are due by 3:00 PM Local Time on May 14, 2021. A pre-proposal meeting and site visit will be held at 1:00 p.m. Alaska Time on May 3, 2021 at Bird Creek Alaska. PPE & face coverings are requiredEstimated Project Amo...

    From: Alaska (State)

  • Gym Roof Structural Replacement & Improvements

    Type : Bid Notification

    Due : 30 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 15 Sep, 2022 (19 months ago)

    It may be necessary to perform truss replacement – opening & closing the roof in three (3) stages – to lessen the chance of having the roof open for more than 72 hours at a time, exposing the interior to weather. Protecting the Gym floor with a temporary waterproof membrane during this time will be important and a fundamental requirement for the work.

    From: Bellefontaine Neighbors (City)