Type : Contract
TUCKPOINT AND SEAL AMBULATORY CARE ADDITION BUILDING 1 PROJECT 589A4-23-103 Solicitation ID/Procurement Identifier: 36C25523R0018 Ultimate Completion Date: Tue Apr 11 17:00:00 GMT 2028
TUCKPOINT AND SEAL AMBULATORY CARE ADDITION BUILDING 1 PROJECT 589A4-23-103 Solicitation ID/Procurement Identifier: 36C25523R0018 Ultimate Completion Date: Tue Apr 11 17:00:00 GMT 2028
Solicitation Number: 36C78623R0031 Project Number: 806NRM23012 Description: Tuckpoint Committal Shelter, Service Seal Wall, and Lodge Window Rehab This notice is provided for information purposes only and does not constitute a request for Bid, Proposal, or Quote.
806NRM23012 TUCKPOINT COMMITTAL SHELTER, SERVICE SEAL WALL, AND LODGE WINDOW REHAB.AT CAMP BUTLER NATIONAL CEMETERY Solicitation ID/Procurement Identifier: 36C78623C50657 Ultimate Completion Date: Fri Dec 29 18:00:00 GMT 2023
PRESOLICITATION NOTICE Request for Architectural and Engineer (A/E) 330 submission Solicitation: 36C25524R0025 Correct Tuckpoint and Water Seal Main Campus Buildings Project No. 589-24-447 Project 589-24-447- Correct Tuckpoint and Water Seal Main Campus Buildings CONTRACT INFORMATION This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation
SCOPE OF WORK: Contractor shall repair and/or tuckpoint all block/brick masonry as necessary, remove/replace damaged or spalling brick (roughly 50), remove caulking between dissimilar materials and window units (4,200 lineal feet) and replace with approved sealant, repair metal ...
Tuckpoint the loose and open mortar joints at the brick wall. Remove the deteriorated sealant and re-seal window frames. Remove the loose mortar and sealant from the door and window joints and re-seal. Remove the deteriorated sealant from the window frame and various joints with new sealant. Reseal the coping stone joints. Tuckpoint the open mortar joints. Remove the deteriorated sealant at the window frames and re-seal.
Tuckpoint all joints on the sand-colored exterior brick, including the inside parapet walls. The Buckstaff has approx. 8600 square feet of sand-colored brick on each story and sides of the Buckstaff bathhouse. See Division 4 for procedure for removing mortar and tuckpointing procedures. Contractor to remove, clean, and re-attach building canopies.2.