Search results for: tunnel

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 5,528
  • Bridge and Tunnel Inventory and Inspection Software

    Type : Bid Notification

    Due : 26 Apr, 2024 (in 6 days)
    Posted : 20 days ago
    Started : 29 Mar, 2024 (21 days ago)

    The DEPARTMENT requires a Bridge (NBI)/ Tunnel Inspection Inventory (NTI) software solution to allow Bridge and Tunnel Inspection staff and its consultants to meet federal requirements.

    From: Nevada Department of Transportation (Transportation)

  • RECS RFP Design Repair and Eval Hillcrest Tunnel

    Type : Bid Notification

    Due : 25 Apr, 2024 (in 5 days)
    Posted : 1 month ago
    Started : 01 Mar, 2024 (1 month ago)

    REFERENCE NUMBER: PT4360 Contracting Agency: Admin - Real Estate & Constr Solicitation Number: 2000015548 Solicitation Event Version: 1 Title: RECS RFP Design Repair and Eval Hillcrest Tunnel Response to this solicitation is due no later than: 04/25/24 at 12:00pm This Solicitation Event is being conducted in the SWIFT system. Log in to the Supplier Portal (link is external) to view this event. You will need to search for Event ID 2000015548.

    From: Minnesota (State)

  • 2024 Tunnel Lighting LED Upgrade

    Type : Bid Notification

    Due : 14 May, 2024 (in 24 days)
    Posted : 3 hours ago
    Started : 04 Apr, 2024 (15 days ago)

    2024 Tunnel Lighting LED Upgrade2024 Tunnel Lighting LED Upgrade Construction Bid Notice MSP Airport May 14, 2024 View

    From: Metropolitan Airports Commission (Airport)

  • EPD: Cemetery Brook Drain Tunnel Project. Request for Qualifications - General Contractor.

    Type : Bid Notification

    Due : 06 May, 2024 (in 16 days)
    Posted : 29 days ago
    Started : 06 Mar, 2024 (1 month ago)

    PROJECT 90% SUBMITTAL - NOT FOR CONSTRUCTION 670 North Commercial Street, Suite 208 Manchester, NH 03101 Tel: (603) 222-8300 PROFESSIONAL ENGINEER SEAL T-01 TUNNEL, SHAFTS, INLET AND OUTFALL STRUCTURE KEY PLAN N T-02 T-03 T-04 T-05 T-05 T-06 T-07 T-07 T-08 T-09 ℄ CBD TUNNEL ℄ CBD TUNNEL ℄ CBD TUNNEL OUTFALL STRUCTURE TRANSITION STRUCTURE DS-1 DS-4 CBD TUNNEL CBD TUNNEL DS-7 INLET STRUCTURE DS-6 DS-5 BOX CULVERT STUB OUT DS-2 SV-1 DS-3 SV-2 KHWAJAM

    From: Manchester (City)

  • ​Construction Engineering for Barton/Bandemer Park Pedestrian Tunnel Project

    Type : Bid Notification

    Due : 01 May, 2024 (in 11 days)
    Posted : 9 days ago
    Started : 26 Mar, 2024 (24 days ago)

    Groundwater may need to be controlled during construction for installation of the culvert. 12 This project includes the construction of approximately 800-feet of non-motorized concrete path, which also includes an 18-foot timber bridge that spans over a relocated stream to be constructed. The pedestrian access provided by this project will be lighted at the tunnel with transition lighting provided on each end of the tunnel.

    From: Ann Arbor (City)

  • 6703-23-0906 - Correction of curve and wear layer west of the St-Nicolas tunnel on route 138 (Franquelin) (Civil engineering works) --- 6703-23-0906 - Co...

    Type : Bid Notification

    Due : 08 May, 2024 (in 18 days)
    Posted : 9 days ago
    Started : 25 Mar, 2024 (25 days ago)

    Reference:6703-23-0906 / 1833964 6703-23-0906 - Correction of curve and wear layer west of the St-Nicolas tunnel on route 138 (Franquelin) (Civil engineering works) --- 6703-23-0906 - Correction de courbe et de couche d'usure à l'ouest du tunnel St-Nicolas sur la route 138 (Franquelin) Source:Government of Quebec SEAO - register with SEAO to receive updates, amendments & addenda NEW OR UPDATED April 08, 2024 2024-05-08 14 h (Closing date appears

    From: Government of Quebec (State)

  • 6703-23-0906 - Correction of curve and wear layer west of the St-Nicolas tunnel on route 138 (Franquelin) (Civil engineering works) --- 6703-23-0906 - Co...

    Type : Bid Notification

    Due : 08 May, 2024 (in 18 days)
    Posted : 10 days ago
    Started : 25 Mar, 2024 (25 days ago)

    Reference:6703-23-0906 / 1833964 6703-23-0906 - Correction of curve and wear layer west of the St-Nicolas tunnel on route 138 (Franquelin) (Civil engineering works) --- 6703-23-0906 - Correction de courbe et de couche d'usure à l'ouest du tunnel St-Nicolas sur la route 138 (Franquelin) Source:Government of Quebec SEAO - register with SEAO to receive updates, amendments & addenda NEW OR UPDATED April 08, 2024 2024-05-08 14 h (Closing date appears

    From: Government of Quebec (State)