Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived
Search results for: tunnel
Showing opportunity 1 - 10 of 89
  • NEW2022 MSP <b>Tunnel</b> Grouting, Project 52205

    NEW2022 MSP Tunnel Grouting, Project 52205

    Type : Bid Notification
    Due : 24 May, 2022 (Today)
    Posted : 21 days ago
    Started : 02 May, 2022 (21 days ago)

    Transit 22P148 NEW2022 MSP Tunnel Grouting, Project 52205 5/2/2022 5/24/2022 IFB

    From: Minnesota Metropolitan Council (Other)
  • 2022 MSP <b>Tunnel</b> Grouting, Project 52205

    2022 MSP Tunnel Grouting, Project 52205

    Type : Bid Notification
    Due : 24 May, 2022 (Today)
    Posted : 13 days ago
    Started : 02 May, 2022 (21 days ago)

    Transit 22P148 2022 MSP Tunnel Grouting, Project 52205 5/2/2022 5/24/2022 IFB

    From: Minnesota Metropolitan Council (Other)
  • Tunnel Trail Bridge Deck Replacement

    Type : Bid Notification
    Due : 02 Jun, 2022 (in 9 days)
    Posted : 12 days ago
    Started : 11 May, 2022 (12 days ago)

    Project Title Tunnel Trail Bridge Deck Replacement Invitation # Bid No. 5955 Bid Posting Date 05/11/2022 11:36 AM (PDT) Project Stage Bidding Bid Due Date 06/02/2022 3:00 PM (PDT) Response Format Electronic Project Type Bid Response Types Line Items Subcontractor REFER TO SECTION 1.7 ORIGINAL DOCUMENTS FOR BID REQUIREMENTS (required) Type of Award Lump Sum Categories

    From: Santa Barbara (City)
  • Shrink Wrap Machine with Tunnel System

    Type : Bid Notification
    Due : 13 Jun, 2022 (in 19 days)
    Posted : 7 days ago
    Started : 16 May, 2022 (8 days ago)

    with Tunnel System.

    From: Texas (State)
  • Redden State Forest Tunnel Tract Commercial Thinning Timber Sale

    Type : Bid Notification
    Due : 02 Jun, 2022 (in 9 days)
    Posted : 8 days ago
    Started : 16 May, 2022 (8 days ago)

    Bid Status Details for Redden State Forest Tunnel Tract Commercial Thinning Timber Sale AGR22002AR Solicitation Ad Date 5/16/2022 Deadline for Bid Responses 6/2/2022 at 1:00 PM Local Time Contact Information kyle.hoyd@delaware.gov Supporting Bid Documents RFP - Materiel and Nonprofessional Services Back To Bids

    From: Delaware (State)
  • FBCMUD No. 58 Pedestrian Tunnel Drainage Improvements Phase II

    Type : Bid Notification
    Due : 31 May, 2022 (in 7 days)
    Posted : 6 days ago
    Started : 02 May, 2022 (21 days ago)

    The Call-in number is (832) 680-2579 and the Conference ID is 899 972 645# for the furnishing of all material, equipment, labor and supervision necessary or incidental to “Construction of Pedestrian Tunnel Drainage Improvements Phase II for Fort Bend County MUD No. 58, Fort Bend County, Texas,” Remove and dispose of existing concrete; and Addition of concrete to existing pedestrian tunnels.

    From: BGE Inc (Other)
  • Provide Batteries for Various HDOT Tunnel Facilities

    Type : Bid Notification
    Due : 30 May, 2022 (in 6 days)
    Posted : 4 hours ago
    Started : 23 May, 2022 (Yesterday)

    Medeiros Attachments 2022 TUNNELS BATTERIES SPECIFICATIONS.pdf 103D-1 General Conditions.pdf Download All Quantity 180 Unit of Measure EACH Title 12 V Valve Regulated Lead Acid (VRLA) Battery Description Refer to specifications.

    From: Hawaii (State)
  • for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-10 from a point 1.360 miles east of the SR-193 Interchange (MP 18.467) to the Wallace <...

    Type : Bid Notification
    Due : 27 May, 2022 (in 2 days)
    Posted : 21 days ago
    Started : 02 May, 2022 (22 days ago)

    Proposal 20220527010 for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-10 from a point 1.360 miles east of the SR-193 Interchange (MP 18.467) to the Wallace Tunnel (MP 26.651) in Mobile. Length 8.272 mi.

    From: Alabama Department of Transportation (Transportation)
  • Master Contract for Inceptor Sewer Tunnel Engineering

    Type : Bid Notification
    Due : 26 Nov, 2025 (in about 3 years)
    Posted : about 4 years ago
    Started : 09 Feb, 2018 (about 4 years ago)

    ES 17P047 Master Contract for Inceptor Sewer Tunnel Engineering 2/9/2018 3/9/2018 RFP

    From: Minnesota Metropolitan Council (Other)