Type : Bid Notification
MORAN TUNNEL PIPE INSTALLATION
MORAN TUNNEL PIPE INSTALLATION
Anticipated areas of work that will be subcontracted for this project are: Surveying, Hauling, Material Testing, Sitework (Demolition, Earthwork, Aggregate Materials, Geotextiles, Clearing, Grubbing, Site Preparation, Clearing, Site Preparation, Grubbing, Earthwork, Aggregate Materials, Flowable Fill, Geotextiles, Erosion and Sedimentation Control, Tunneling by Guided Bore and Jack, Tunnel Grout, Installation of Carrier Pipe in Tunnels, Paving and
" Provision of pipe, piping hot taps; excavation, tunneling, or boring as required for pipe installation, along with all required casing spacers, tunnel supports, tunnel safety provisions, tunnel dewatering, traffic control provisions including barricades, signage, and safety fencing, valve boxes with traffic rated lids, valve operator stem extensions; butterfly valves and gear operators; air elimination assemblies to include buried traffic-rated
Complete In Place Trenchless Pipe Lining Contract Number: 18PSX0285 Award Date: 05/30/2019 Contact: Arlene Watson-Paulin Telephone: (860) 713-5237 E-Mail: arlene.watson-paulin@ct.gov For More Details(Doc.): https://biznet.ct.gov/..
Tires, Tubes & Services VA-NASPO #19101, 19102, 19103 Various (3) 06/30/2024 0.0 MR
" Provision of pipe, piping hot taps; excavation, tunneling, or boring as required for pipe installation, along with all required casing spacers, tunnel supports, tunnel safety provisions, tunnel dewatering, traffic control provisions including barricades, signage, and safety fencing, valve boxes with traffic rated lids, valve operator stem extensions; butterfly valves and gear operators; air elimination assemblies to include buried traffic-rated