Search results for: underground concrete water

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 98
  • Underground concrete water storage tank

    Type : Bid Notification

    Due : 24 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 11 Jun, 2020 (about 3 years ago)

    10,000 gallon underground Storm Water Storage TankMust have H-20 Traffic Load Rating               • H-20 Loading: American Association of State Highway Transportation Officials (AASHTO) published its bridge design criteria, commonly known as H-20 or HS-20.

    From: Federal Government (Federal)

  • Town of Ituna Water Treatment Plant Upgrades

    Type : Bid Notification

    Due : 08 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 21 Dec, 2023 (4 months ago)

    The work involves upgrade of the Town of Ituna's Water Treatment Plant including expansion of the existing treatment plant building, expansion of the existing underground concrete water reservoir, installation of a new biological filtration system, demolition of the existing treatment system and electrical, instrumentation and controls system, connection of a new well located adjacent to the water treatment plant, associated electrical, instrumentation

    From: Associated Engineering-Saskatchewan (Co-op)

  • Aldersyde Water Treatment Plant Contract 2 - Construction Pre-Qualification

    Type : Bid Notification

    Due : 06 Dec, 2023 (4 months ago)
    Posted : 5 months ago
    Started : 15 Nov, 2023 (5 months ago)

    Aldersyde Water Treatment Plant Contract 2 - Construction Pre-Qualification Project Description :Aldersyde Water Treatment Plant, work at this location comprises the civil, structural, architectural, process mechanical, building mechanical, electrical, instrumentation, and control works for the construction of a new, fully- functional membrane WTP, underground utilities, concrete treated water reservoir, construction of new process waste holding pond

    From: MerX (Federal)

  • 2nd St. & Tallokas SE Roundabout

    Type : Bid Notification

    Due : 30 Apr, 2024 (2 days ago)
    Posted : 2 days ago
    Started : 28 Mar, 2024 (1 month ago)

    More specifically, the work consists of the demolition and removal of concrete and asphalt. The proposed improvements will consist of installing storm pipe, curb & gutter, directional boring underground conduit, 6¿ water main, hydrant relocation, concrete flatwork, basing, milling, paving, and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings.

    From: Georgia (State)

  • Town of Middlebury South Street Phase IV Waterline Replacement Project

    Type : Bid Notification

    Due : 20 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 21 Feb, 2023 (14 months ago)

    Contract consists of the installation of multiple water main interconnections, two (2) underground precast concrete valve structures, approximately 3,200 lineal feet of new ductile iron water line with associated fittings, approximately 1,370 lineal feet of new copper water service lines with associated fittings, multiple fire hydrant branch connections, installation and maintenance of temporary water main and services, and road surface restoration

    From: Vermont (State)

  • Town of Middlebury South Street Phase IV Waterline Replacement Project

    Type : Bid Notification

    Due : 21 Feb, 2023 (14 months ago)
    Posted : 14 months ago
    Started : 21 Feb, 2023 (14 months ago)

    Contract consists of the installation of multiple water main interconnections, two (2) underground precast concrete valve structures, approximately 3,200 lineal feet of new ductile iron water line with associated fittings, approximately 1,370 lineal feet of new copper water service lines with associated fittings, multiple fire hydrant branch connections, installation and maintenance of temporary water main and services, and road surface restoration

    From: Vermont (State)

  • South Street Phase IV Waterline Replacement Project

    Type : Bid Notification

    Due : 21 Feb, 2023 (14 months ago)
    Posted : 14 months ago
    Started : 21 Feb, 2023 (14 months ago)

    Contract consists of the installation of multiple water main interconnections, two (2) underground precast concrete valve structures, approximately 3,200 lineal feet of new ductile iron water line with associated fittings, approximately 1,370 lineal feet of new copper water service lines with associated fittings, multiple fire hydrant branch connections, installation and maintenance of temporary water main and services, sidewalk replacement and road

    From: Vermont (State)