Type : Bid Notification
Replacement of batteries EATON 9390 Uninterruptable Power Supply (UPS) Northwest, Chesapeake SEE ATTACHED RFQ SEE ATTACHED ANNEX A, ANNEX B, ANNEX C, AND BRAND NAME JUSTIFICATION
Replacement of batteries EATON 9390 Uninterruptable Power Supply (UPS) Northwest, Chesapeake SEE ATTACHED RFQ SEE ATTACHED ANNEX A, ANNEX B, ANNEX C, AND BRAND NAME JUSTIFICATION
Contract Name : Rickenbacker ANGB Building 942 Uninterruptable Power Supply (UPS) systems Installation. Rickenbacker ANGB Building 942 Uninterruptable Power Supply (UPS) systems Installation. Supplier : BROWN ENTERPRISE SOLUTIONS LLC Contract ID : CTR020196 State Contract Number : CTR020196 Contract Sub-Type: General Services Agreement
The Mission and Installation Contracting Command (MICC) - Fort Eustis, Virginia is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support the requirement for maintenance of Uninterruptable Power Supplies (UPS) and supportive thermal equipment. The intention is to procure these services on a competitive basis.
shall collectively demonstrate experience in all three (3) individual features: (1) Precision Cooling System, (2) Uninterruptable Power Supply System, and (3) Clean Agent Fire Suppression System.
The period of performance will begin 01 JUL 2024.The North American Industry Classification System (NAICS) code for this contract is 335910 – Battery Manufacturing, the Federal Supply Code is 6140 - Batteries, Rechargable, and the size standard is 1,250 Employees.
Power Supply, UPS (1) - Barcode scanner with holder Pipettes Installation On-site training Minimal Daily maintenance, minimal hands-on technologists time OTHER UNIQUE REQUIREMENTS: Compatibility with Existing Equipment: MALDI equipment must interface with Beckman Coulter Microscan software.
The existing UPS synchronizing circuit in the Uninterruptable Power Supply (UPS) Switchgear (SWGR) that checks for synchronization between generator and utility source was never properly documented. To fill this gap, it will be documented, demonstrated, and training provided to site personnel.Questions should be addressed to john.m.ross138.civ@mail.mil.