Search results for: unloading ramp

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 67
  • 36--Self Propelled Rail loading/unloading ramp

    Type : Bid Notification

    Due : 12 Aug, 2022 (20 months ago)
    Posted : 20 months ago
    Started : 08 Aug, 2022 (20 months ago)

    This time supersedes the Offers Due Time listed above.FOB Destination shall be Fort Drum, NY 13602The MICC End User requires the following items, Brand Name or Equal, to the following:LI 001: Furnish and deliver 1 each of the following items, Self Propelled rail car loading/unloading ramp BUCK MODEL CDSP-404HD 20 ton capacity or comparable. The following items are the minimum standards required on this piece of equipment.

    From: Federal Government (Federal)

  • Military Ocean Terminal Concord (MOTCO) Boat Ramp

    Type : Bid Notification

    Due : 03 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Feb, 2022 (about 2 years ago)

    Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to construct the MOTCO boat ramp.The Loading Unloading Ramp consists of a concrete ramp for small vessels with a floating dock. This project consists of a base bid with an option. The base bid includes the ramp and floating dock with minimal dredging that only extends to the footprint of the ramp but not the floating dock.

    From: Federal Government (Federal)

  • Berths 238-239 Marine Oil Terminal Improvements

    Type : Bid Notification

    Due : 27 Jul, 2023 (8 months ago)
    Posted : 10 months ago
    Started : 24 Mar, 2023 (13 months ago)

    Amir Zavichi Email azavichi@portla.org Phone No:310-732-0307 Project Description:The Project consists of demolition and removal of the existing concrete loading/unloading platforms, catwalks, access ramps, mooring and berthing dolphins at Berths 238 and 239 and the construction of a new oading/unloading platform, access ramp, 2 berthing dolphins, 4 landside mooring dolphins, catwalks, installation

    From: Los Angeles (City)

  • 54--502-18-3-084-0109 - "At Risk" - 4 Room Fold Out Medical Shelter Units - 36C256-18-AP-1036

    Type : Bid Notification

    Due : 15 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 10 Aug, 2018 (about 5 years ago)

    Dual 110v outlets in office, (1) ea. 110v Dual Outlet within eachexam room.-20kW Diesel Generator with Generator unloading ramp and winch kit.- Include (1) ea. 15' x 9' Exterior Awning at front entrance.-Must have (1) ea. CAT 6 Data port in each exam room, (2) ea. Data ports in theOffice.-Must be equipped with LED lighting for illumination.

    From: Federal Government (Federal)

  • Sheffield Street Floating Docks and Ramp

    Type : Bid Notification

    Due : 03 May, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 11 Apr, 2019 (about 5 years ago)

    Proposals shall include the fabrication and delivery of floating docks and an aluminium ramp. The unloading and installation of the floating docks and ramp will be performed by others. It is anticipated the delivery of the floating docks and ramp shall be in the spring of 2020. Documents Sheffield Street Floating Docks and Ramp The Department of Administrative Services - Business Network.

    From: Connecticut (State)

  • LYNX Bottle, Cage & Rack Washer

    Type : Bid Notification

    Due : 20 Jun, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 15 Jun, 2018 (about 5 years ago)

    The hinges on the dirty side door needs to be on the right side and the ones on the clean side, the left. 3) It requires a side tank for storing and reusing alkaline detergent. 4) The services must be on the left hand side. 5) Washing compartment must be at least 46"W X 85"H X 88"L. 6) Loading and unloading ramps must be supplied.One (1) LYNX Model 340LX Cage & Bottle Washer with the following features and options:A.

    From: Federal Government (Federal)

  • Berths 238-239 Marine Oil Terminal Improvements

    Type : Bid Notification

    Due : 10 Aug, 2023 (8 months ago)
    Posted : 10 months ago
    Started : 23 Mar, 2023 (13 months ago)

    access ramps, mooring and berthing dolphins at Berths 238 and 239 and the construction of a new loading/unloading platform, access ramp, 2 berthing dolphins, 4 landside mooring dolphins, catwalks, installation of a new fender system at Berth 238 and improvements in accordance with Drawing No. 1-3341.

    From: Los Angeles CDBON (Port)