Search results for: upper miss river

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 14
  • DEBRIS REMOVAL AND DUMPSTER - US FWS UPPER MISS RIVER NWR - IA

    Type : Contract

    Due : 05 Jul, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 06 May, 2022 (about 2 years ago)

    DEBRIS REMOVAL AND DUMPSTER - US FWS UPPER MISS RIVER NWR - IA Solicitation ID/Procurement Identifier: 140F0622Q0094 Ultimate Completion Date: Tue Jul 05 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)

  • WI UPPR MSS RIV NWFREF-MC DST DEBRIS REM

    Type : Bid Notification

    Due : 21 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Apr, 2022 (about 2 years ago)

    Debris Removal and Dumpster - US FWS Upper Miss River NWR - IA

    From: Federal Government (Federal)

  • Baldwin Lake Boat Launch Improvements

    Type : Bid Notification

    Due : 11 Jul, 2024 (in 2 months)
    Posted : 10 months ago
    Started : 26 Jun, 2023 (10 months ago)

    Contractor must maintain access for emergency vehicles at all times. 2.13 SOIL EROSION AND SEDIMENTATION CONTROL The Contractor must conduct operations in such a manner that all soil is confined within the project limits and prevented from entering storm sewers, water courses, rivers, lakes, reservoirs, or wetlands.

    From: Greenville (City)

  • WPC Third Avenue Pumping Station Improvements – Exhibits 4 & 5

    Type : Bid Notification

    Due : 22 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 28 Jun, 2021 (about 2 years ago)

    We recommend the pier foundations at the proposed building location be extended through the upper fill soils to bear into the lower suitable native clay soils.

    From: Flint (City)

  • Bid #2024-002 Hollywood Road Bridge

    Type : Bid Notification

    Due : 07 Feb, 2024 (2 months ago)
    Posted : 4 months ago
    Started : 20 Dec, 2023 (4 months ago)

    Construct the upper key trench to be 11⁄2 feet deep, or three times the minimum riprap dimension, whichever is greater. Provide a setback between the top of the slope and the upper key trench at least equal to the trench depth. Backfill the upper trench with riprap material unless otherwise directed by the Engineer. Overlap geotextile seams by at least 2 feet.

    From: Berrien County Road Department (County)

  • Resurfacing of County Roads on a Term Contract

    Type : Bid Notification

    Due : 18 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 13 Jan, 2021 (about 3 years ago)

    The upper edge of the top reflectorized stripe on the drum shall be located a minimum of 33 inches above the surface of the roadway.

    From: Gwinnett County (County)

  • Clothier Rd Structure Replacement

    Type : Bid Notification

    Due : 16 Feb, 2023 (14 months ago)
    Posted : 14 months ago
    Started : 30 Jan, 2023 (15 months ago)

    Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river. V. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation. W.

    From: Tuscola County Road Commission (City)