Type : Bid Notification
IFB/RFP/RFI/RFQ Number -> 212721 Title -> Construction Manager at Risk (CMAR) for 22nd Street Bridge at UPRR Construction Pre-Bid Date -> 5/4/2021 Due Date ->6/8/2021
People also searched for
IFB/RFP/RFI/RFQ Number -> 212721 Title -> Construction Manager at Risk (CMAR) for 22nd Street Bridge at UPRR Construction Pre-Bid Date -> 5/4/2021 Due Date ->6/8/2021
Sealed bids addressed to Bill Stablein, Project Manager, City of Round Rock, Transportation Department, 2008 Enterprise Drive, Round Rock, Texas 78664, for: Roadway Improvements at Various Locations along UPRR Line & Traffic Signal Construction at McNeil Road at St.
This project is for the construction of the UPRR 24-Inch Interceptor Sewer Rehabilitation Phase 3 Project and consists of rehabilitating the UPRR 24-Inch Interceptor Sewer. The rehabilitation effort includes approximately 3,173 linear feet using trenchless rehabilitation techniques (CIPP thermally cured or UV cured). The project also includes approximately 3,600 linear feet of temporary sewer by-pass pumping.
Montebello Boulevard will be lowered beneath the UPRR Railroad.
The scope of the work shall consist of furnishing and fabrication of precast prestressed concrete beams, steel beam diaphragms and the associated materials and hardware for the construction of the I-294 bridges over UPRR (Bridge Numbers 287 & 288/ Structure Numbers 016-9387 & 016-9386), store material until needed for erection and deliver to jobsite for placement.
Title: Construction Management Services, Indian Canyon Dr. Widening & UPRR Bridge Replacement Federal Aid Project See Attachment "F" - Local Assistance Procedures Manual Forms (page 97 of the RFP) for reference to each Form below: (LAPM) 10-H2 Sample Format Cost Proposal (LAPM) 10-I (LAPM) 10-O1 (LAPM) 10-O2 (LAPM) 15-H (LAPM) 10-Q Registered Consultant List Addendum 1 Addendum 2 Solicitation No.: RFP 06-18 Due Date: 4/4/18
Improvements include the construction of a bridge structure over UPRR, bridge structure for braided WB Decatur off ramp, and bridge modifications to existing Valley View Boulevard Bridge. BID OPENING WEBEX DETAILS Meeting Link: https://clarkcountynv.webex.com/clarkcountynv/j.php?