Search results for: usace hydropower

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 35
  • Turbine Maintenance USACE Hydropower SAD

    Type : Bid Notification

    Due : 01 Feb, 2023 (15 months ago)
    Posted : 18 months ago
    Started : 11 Jan, 2023 (15 months ago)

    Repair of Hydroelectric Generator Turbines, Water Passages, and Ancillary Equipment at Hydroelectric Facilities for the U.S. Army Corps of Engineers within the South Atlantic Division for a five year period. NAICS Code has been changed to 333611.

    From: Federal Government (Federal)

  • J&A Sole Source for Membership to HRI

    Type : Bid Notification

    Due : 06 May, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 06 Apr, 2023 (13 months ago)

    The government intends to solicit and negotiate with only one source, Hydropower Research Institute (HRI), 1250 N. Wenatchee Ave. Wenatchee, WA 98801 for membership to HRI which allows the USACE Hydropower to store and aggregate hydropower operation data for our powerplants.

    From: Federal Government (Federal)

  • Notice of Intent to Sole Source Brand Name ABB Inc.

    Type : Bid Notification

    Due : 06 Apr, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 24 Mar, 2023 (13 months ago)

    The USACE Hydropower plant, located at the Soo Project Office, has been identified as “critical” to facility operations by the Cloverland Electric Company and to the Greater Eastern Upper Peninsula Region of Michigan. An exciter failure is considered a “critical” failure, and results in the Hydro Generator shutting down. ABB is the manufacture and installer of the existing static exciter.

    From: Federal Government (Federal)

  • Notice of Intent to Sole Source Brand Name Voith

    Type : Bid Notification

    Due : 13 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 24 Mar, 2023 (13 months ago)

    The USACE Hydropower plant, located at the Soo Project Office, has been identified as “critical” to facility operations by the Cloverland Electric Company and to the Greater Eastern Upper Peninsula Region of Michigan. A governor failure is considered a “critical” failure, and results in the Hydro Generator shutting down. Voith is the manufacture and installer of the existing governor control system.

    From: Federal Government (Federal)

  • Notice of Intent to Sole Source with CEATI International - Hydropower Special Interest Membership

    Type : Bid Notification

    Due : 08 Jun, 2022 (23 months ago)
    Posted : 23 months ago
    Started : 23 May, 2022 (23 months ago)

    Army Corps of Engineers (USACE), Portland District (NWP) intends to negotiate/award a sole-source contract with CEATI INTERNATIONAL INC, for the training and education of USACE personnel within the hydropower generation and maintenance fields through collaboration and workshops with organizations around the world who own and/or operate hydropower facilities or generally contribute to the betterment of hydropower facilities. 

    From: Federal Government (Federal)

  • Notice of Intent to Sole Source with CEATI International - Hydropower Special Interest Membership

    Type : Bid Notification

    Due : 20 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 02 Nov, 2023 (6 months ago)

    Army Corps of Engineers (USACE), Portland District (NWP) intends to negotiate/award a sole-source contract with CEATI INTERNATIONAL INC, for the training and education of USACE personnel within the hydropower generation and maintenance fields through collaboration and workshops with organizations around the world who own and/or operate hydropower facilities or generally contribute to the betterment of hydropower facilities.

    From: Federal Government (Federal)

  • Harry S. Truman Lake Zebra Mussel Mitigation Sources Sought

    Type : Bid Notification

    Due : 30 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 09 Mar, 2022 (about 2 years ago)

    Have you installed similar systems for USACE or BLM Hydropower Plants in the last five years? Provide examples of project scope, schedule and budget.C. Have you installed three systems that have been permitted by Missouri (MDNR) utilizing this technique (does not need to be a hydropower installation)? Provide project scope, schedule and budget.D.

    From: Federal Government (Federal)