Type : Bid Notification
The contractor is responsible for the protection of existing utilities and infrastructure located below ground level, and additional utility locates may be necessary during construction. The pond area will be sodded once the pond has been excavated to final depth, and disturbed grass areas will be re-sodded. Any facilities unrelated to this project that are damaged or destroyed during the project will be restored at the contractor’s expense.