Search results for: utilities and metal deck

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 292
  • UTILITIES AND METAL DECK (LIVE WELL) COVER PROVIDED AT NSWC CRANE LAKE GLENDORA TEST FACILITY

    Type : Bid Notification

    Due : 12 Dec, 2022 (15 months ago)
    Posted : 16 months ago
    Started : 29 Nov, 2022 (16 months ago)

    Late requests to attend this event w ill not be considered.No other changes are being made under this amendment.N0016423Q0044 – UTILITIES AND METAL DECK (LIVE WELL) COVER PROVIDED AT NSWC CRANE LAKE GLENDORA TEST FACILITY - FSG 6610 – NAICS 238990ISSUE DATE 21 NOV 2022 – CLOSING DATE 12 DECEMBER 2022 – 4:00 PM EASTERN TIMENaval Surface Warfare Center (NSWC) Crane has a requirement for utilities (HVAC, electric, compressed air) and metal deck (live

    From: Federal Government (Federal)

  • Design Bid-Build P228 ATC Tower and Air Operations, Marine Corps Air Station, Cherry Point, North Carolina

    Type : Award

    Due : 25 May, 2024 (in 1 month)
    Posted : 6 months ago
    Started : 30 Sep, 2023 (6 months ago)

    This building will include a reinforced concrete-on-pile foundation, cast in place or precast concrete exterior walls and a prefabricated metal deck cab roof.

    From: Federal Government (Federal)

  • Portola High School Classroom Expansion - Phase 2

    Type : Bid Notification

    Due : 25 Apr, 2024 (in 27 days)
    Posted : 14 days ago
    Started : 11 Apr, 2024 (in 13 days)

    Specialties B 2 Concrete, Reinforcing Steel, Demo and Grading B or C8 3 Masonry C29 4 Structural Steel, Metal Deck and Misc.

    From: Irvine Unified School District (School)

  • Design Bid-Build P228 ATC Tower and Air Operations, Marine Corps Air Station, Cherry Point, North Carolina

    Type : Bid Notification

    Due : 20 Dec, 2022 (15 months ago)
    Posted : 16 months ago
    Started : 16 Dec, 2022 (15 months ago)

    This facility will have appropriate electronic equipment spaces. Construct a new Airfield Operations building located on the flight line. This building will be masonry veneer with a metal deck roof over open web steel joist framing on a concrete foundation.

    From: Federal Government (Federal)

  • Fairview ES Exterior Modifications

    Type : Bid Notification

    Due : 26 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 22 Dec, 2021 (about 2 years ago)

    Also included in the Work is renovating an existing bus canopy by removing the existing roof materials and metal deck, replacing with new cellular metal deck and TPO roof system along with painting structural steel frame and cleaning concrete walkway and retaining walls and repainting railings. 2022-180000-01113 Non-State Agency Open Non-State Agency Non-State Agency K-12 2022 NIGP Codes: 90927Building Construction, Educational

    From: Georgia (State)

  • FORMA ITB: Kent East Hill Operations Center Warehouse

    Type : Bid Notification

    Due : 27 Feb, 2024 (1 month ago)
    Posted : 1 month ago
    Started : 12 Feb, 2024 (1 month ago)

    The site has been rough graded and some underground utilities are already in place. The work in this Contract shall include all other work necessary for a complete project, including: Site work with earthwork, grading, paving, underground utilities, and landscaping. All concrete work, including foundations, slab on grade, topping slab at second floor over the metal deck provided by Metal Building Contractor, and tilt-up panels.

    From: Washington State Office of Minority and Women (State)

  • FORMA ITB: Kent East Hill Operations Center Warehouse

    Type : Bid Notification

    Due : 27 Feb, 2024 (29 days ago)
    Posted : 1 month ago
    Started : 23 Jan, 2024 (2 months ago)

    The site has been rough graded and some underground utilities are already in place. The work in this Contract shall include all other work necessary for a complete project, including: Site work with earthwork, grading, paving, underground utilities, and landscaping. All concrete work, including foundations, slab on grade, topping slab at second floor over the metal deck provided by Metal Building Contractor, and tilt-up panels.

    From: Ben Franklin Transit (Transportation)