Search results for: utility survey

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 43
  • 140R1019D0006 C-PN GENERAL AE IDIQ, 140R1024F0024 JACOBS ENGINEERING, SCOGGINS DAM <b>UTILITY</b> <b>SURVEY</b>

    140R1019D0006 C-PN GENERAL AE IDIQ, 140R1024F0024 JACOBS ENGINEERING, SCOGGINS DAM UTILITY SURVEY

    Type : Contract

    Due : 13 Sep, 2024 (in 4 months)
    Posted : 1 month ago
    Started : 28 Mar, 2024 (1 month ago)

    140R1019D0006 C-PN GENERAL AE IDIQ, 140R1024F0024 JACOBS ENGINEERING, SCOGGINS DAM UTILITY SURVEY Solicitation ID/Procurement Identifier: 140R1019D0006 Ultimate Completion Date: Fri Sep 13 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • C1ND--523-24-007 MWRA Wastewater Compliance A/E Request for SF330 Qualifications

    Type : Bid Notification

    Due : 17 May, 2024 (in 17 days)
    Posted : 9 days ago
    Started : 19 Apr, 2024 (10 days ago)

    This involves fully investigating underground utilities through use of ground penetrating radar, or similar method, to locate depths and types of utilities for connections or for relocation. The VA will provide information based on past and current projects however, verification is the responsibility of the A/E. Provide for the relocation of exterior utilities in the design.

    From: Federal Government (Federal)

  • RFP: Leachate Force Main

    Type : Bid Notification

    Due : 21 May, 2024 (in 21 days)
    Posted : 2 days ago
    Started : 26 Apr, 2024 (4 days ago)

    Right-of-Way Services Consultant will provide right-of-way services including conditional utility permitting, notification letters to adjacent property owners along right-of-way, and coordination with utility companies for utility location. 3. Project Design Survey Consultant will be responsible for obtaining topographic, easement, and utility surveys necessary for final design drawings. 4.

    From: Brookings (City)

  • Notice for Water Right Application LAS 28764

    Type : Bid Notification

    Due : 03 May, 2024 (in 3 days)
    Posted : 11 days ago
    Started : 17 Apr, 2024 (12 days ago)

    The application proposes the following:The withdrawal of up to 8,000 gallons/day from January 1 st through December 31 st each year from a drilled well, 56 1⁄2 feet deep, located within a public utility easement within Lot 2, Block 7 of U.S.

    From: Alaska (State)

  • Campus-Wide <b>Survey</b>, Mapping, and <b>Utility</b> Locating

    Campus-Wide Survey, Mapping, and Utility Locating

    Type : Contract

    Due : 14 May, 2024 (in 14 days)
    Posted : 10 days ago
    Started : 19 Apr, 2024 (10 days ago)

    Campus-Wide Survey, Mapping, and Utility Locating Agency: State University of New York (SUNY) Category:Architectural, Engineering & Surveying - Construction Professional Services Issue Date:04/19/2024 Due Date: 05/14/2024 Ad Type:General

    From: New York State Contract Reporter (City)

  • Intersection Improvement Project Development Services 4 Intersection Improvement Projects Spread Throughout Various Counties

    Type : Bid Notification

    Due : 11 Jun, 2024 (in 1 month)
    Posted : 20 days ago
    Started : 25 Mar, 2024 (1 month ago)

    The selected firm will perform Preliminary Engineering and Plan Development Services necessary to produce the construction contract documents, including the following services: Environmental Documentation Preparation, Topographic Survey Data Collection, Design and Plan Development, Utility Coordination, Geotechnical Services, Pavement Design, Permits, R/W Engineering Services (including Title Research, R/W Engineering, & Staking), Intelligent Transportation

    From: Indiana Department of Transportation (Transportation)

  • Project Development Services Three Access Control projects along I-65 in Lake County

    Type : Bid Notification

    Due : 14 May, 2024 (in 14 days)
    Posted : 6 months ago
    Started : 12 Oct, 2023 (6 months ago)

    The selected firm will be required to provide all Environmental Documentation, all Permits, Public Hearing/Public Involvement, Topographic Survey, Utility Coordination, Design, and Construction Phase Services. Additional services may also be required, such as, Wetland Mitigation, Archaeological Investigations, Historical/Architectural Investigations, and Subsurface Utility Engineering.

    From: Indiana Department of Transportation (Transportation)