Search results for: valve and finished

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 3,100
  • Griswold WPF Finished Water Reservoir Repairs and Clearwell Valve Replacement

    Type : Bid Notification

    Due : 16 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 26 Sep, 2019 (about 4 years ago)

    Griswold WPF Finished Water Reservoir Repairs and Clearwell Valve Replacement Location Colorado Publication Date 09/26/2019 Closing Date 10/16/2019 02:00 PM MDT

    From: Rocky Mountain (Co-op)

  • Valve and Finished Water Tank & Reservoir Improvements

    Type : Bid Notification

    Due : 19 Jul, 2022 (21 months ago)
    Posted : 22 months ago
    Started : 02 Jun, 2022 (23 months ago)

    The work also includes miscellaneous improvements at multiple finished water storage tanks and reservoirs including steel pipe and surface recoating, access and ventilation improvements, and overflow piping replacement. 0000290851 Colin Spencer cspencer@a2gov.org Emily Schlanderer ESchlanderer@a2gov.org PU.AG.USA.1188.C6048051 United

    From: Ann Arbor (City)

  • STEM,FLUID VALVE

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 3 days)
    Posted : 27 days ago
    Started : 03 Apr, 2024 (22 days ago)

    TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER ____________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.18.3 Material certification data forwarded by the manufacturer must contain a signed certification that the

    From: Federal Government (Federal)

  • Water Pump Control Valves, Finished Water, 14-inch, Addison-Evans

    Type : Bid Notification

    Due : 09 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 29 Oct, 2021 (about 2 years ago)

    Number Name Manufacturer Name Qty Unit Delivery Address Desired Delivery Date 1 Furnish and Install 14" Pump Control Valve 2 each 1 total 1 attachment Solicitation Attachments Mandatory Documents 1. RFQ22000154 Equipment and Installation Specs.pdf

    From: Chesterfield (County)

  • VALVE ASSEMBLY

    Type : Bid Notification

    Due : 24 Apr, 2024 (1 day ago)
    Posted : 15 days ago
    Started : 10 Apr, 2024 (15 days ago)

    If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.

    From: Federal Government (Federal)

  • Package No. 2: South Lake Finished Water Line

    Type : Bid Notification

    Due : 03 Aug, 2022 (21 months ago)
    Posted : 21 months ago
    Started : 07 Jul, 2022 (21 months ago)

    PRJ000101 Bid No. 202236 Contract No. 22-0106-CIP The project consists of furnishing, installing and providing all labor and materials required for construction of 5,700 LF of 60-inch finished waterline, air valve manholes, butterfly valves and appurtenances as more fully described in the Drawings and the summary of work contained in Section CIP3.

    From: Georgetown (City)

  • SEAT,VALVE

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 3 days)
    Posted : 27 days ago
    Started : 29 Mar, 2024 (27 days ago)

    Manufacturers of seats that do not have a ball of the required size available will be required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension. 3.4 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at:

    From: Federal Government (Federal)