Search results for: vance air

Refine your Search
Apply several filters to get precise search results

People also searched for

furniture management services
Showing opportunity 1 - 10 of 128
  • Shelf Stocking, Receiving/Storage/Holding Area (RSHA), and Custodial Operations for the Vance Air Force Base Commissary

    Type : Bid Notification

    Due : 29 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 18 Aug, 2022 (20 months ago)

    The Contractor shall furnish all personnel, supervision, supplies, equipment, tools, materials and other items and services as necessary to perform shelf stocking, receiving/storage/holding area (RSHA), and custodial tasks in accordance with (IAW) this contract at the Vance Air Force Base Commissary located at 216 Field Street, Building 410, Vance AFB, Oklahoma 73705-5702, (Enid, Ok).

    From: Federal Government (Federal)

  • DRAFT: Shelf Stocking, Receiving/Storage/Holding Area (RSHA), and Custodial Operations for the Vance Air Force Base Commissary

    Type : Pre-Bid Notification

    Due : 28 Sep, 2022 (19 months ago)
    Posted : 21 months ago
    Started : 28 Jul, 2022 (21 months ago)

    The Contractor shall furnish all personnel, supervision, supplies, equipment, tools, materials and other items and services as necessary to perform shelf stocking, receiving/storage/holding area (RSHA), and custodial tasks in accordance with (IAW) this contract at the Vance Air Force Base Commissary located at 216 Field Street, Building 410, Vance AFB, Oklahoma 73705-5702, (Enid, Ok).

    From: Federal Government (Federal)

  • Gate Marquee Project for Vance Air Force Base

    Type : Bid Notification

    Due : 31 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 16 Jul, 2020 (about 3 years ago)

    Project consists of providing all necessary support, materials, equipment, and accessories to remove, install, and integrate new marquees  at the Main (Gott Rd) and West (Elam Rd) gates, Vance AFB, OK. according to the attached Statement of Work.A Pre-Bid conference and site visit will be conducted on 23 July 2020_ (date) at _10:00 AM. Central Time. (hour) local time, at Building 200 Conference Room 123, 400 Young Road, Vance AFB.   

    From: Federal Government (Federal)

  • FY24-FY28 Pavement Painting and Rubber Removal at Vance AFB

    Type : Bid Notification

    Due : 10 Jun, 2024 (in 1 month)
    Posted : 7 days ago
    Started : 25 Apr, 2024 (8 days ago)

    The work is located at Vance Air Force Base (AFB), south of Enid, OK and KegelmanAuxiliary Air Field (AAF), north of Jet, OK.There will only be one site visit for this project and it is scheduled for May 7, 2024 at 9:00 AM Central Standard Time. This site visit will include a visit to Kegelman Auxiliary Air Field.

    From: Federal Government (Federal)

  • Vance Air Force Base Repair Center Runway B 17235

    Type : Bid Notification

    Due : 02 Mar, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 23 Feb, 2021 (about 3 years ago)

    This is an unrestricted single phase project solicited with the intent to repair Runway 17C/35C and Overruns, and rectify all current UFC deficiencies and existing waivers identified with the Center Runway (17C/35C), Taxiway A, Taxiway C, Taxiway D, Taxiway F, and within the closed diagonal Runways at Vance AFB in Enid, Oklahoma in accordance with the most recent sustainment, restoration, and modernization (SRM) requirements.

    From: Federal Government (Federal)

  • Vance Air Force Base IFB279B Repair Hangar Lighting F170

    Type : Bid Notification

    Due : 20 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 12 Oct, 2021 (about 2 years ago)

    SCOPE OF WORK consist of the following: Removal of current fixtures and installation of New LED Light Fixtures. The maximum shutdown time allowed for completion of work is two (2) weeks. Contractor to coordinate shutdown with the AFFS Construction Manager. Removal and disposal of high bay high pressure sodium lights in hangar 170, provide and install new LED light fixtures. Removal and disposal of 63 high bay High Pressure Sodium lights from hanger ceiling and existing wiring.CONTRACTOR REQUIREMENTS:The Contractor awarded will need to provide information to have business set up for payment.  Also will need to fill out forms for Reps & Certs, W-9, & Authorization Agreement For Vendor Automatic Electronic Funds Transfer.  If you are large bus...

    From: Federal Government (Federal)

  • Vance Air Force Base IFB280B Repair Substation Main Switch

    Type : Bid Notification

    Due : 20 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 12 Oct, 2021 (about 2 years ago)

    SCOPE OF WORK consist of the following: For primary circuits, the term "install" includes the following: Conventional installation using trench and fill method including all preparation work for trenching, digging the trench, setting conduit spacers, laying conduits, bringing conduits to the surface at switch locations and properly terminating same, placing the sand bedding, cleaning the conduit, all preparation work for pulling conductors, pulling same, and attaching terminations on the ends of conductors; and, finally, backfilling trench and replacing disturbed earth, and re-sodding as necessary to leave a clean and neat appearance. Any remaining spoil is to be properly disposed of if not used as backfill. See Schedule F CONTRACTOR REQUIR...

    From: Federal Government (Federal)