Type : Bid Notification
Due : 12 Aug, 2022 (20 months ago)
Posted : 21 months ago
Started : 15 Jul, 2022 (21 months ago)
The project scope is to add culverts under Vernon Jones Ave, raise the grade of the roadway in this area and widen a short section of the roadway. The work required will include but not be limited to: removal of existing pavement, earthwork, storm drain, roadway widening, traffic control, asphalt paving, and all other work required as shown on the Construction Plans and in the Specifications.