Type : Bid Notification
and motor equipment Vibration Monitoring, Analysis and Reporting for the City of Dallas Water Utilities Department.
and motor equipment Vibration Monitoring, Analysis and Reporting for the City of Dallas Water Utilities Department.
installation of approximately 40m of 300mm diameter PVC sanitary sewer pipe inside a 610mm OD steel casing pipe using guided horizontal auger boring method • Supply and installation of approximately 40m of 675mm diameter PVC storm sewer pipe inside a 1067mm OD steel casing pipe using guided horizontal auger boring method • Traffic control throughout construction involving coordination and traffic management plan approval from the City • Settlement and vibration
, Vibration Monitoring, and Rodent Control and Extermination Non-DBE Subs/Suppliers: You will be expected to carry a proportionate percentage of 2nd-tier DBE participation with your quote. 2nd-tier DBE participation will be evaluated with your price. 100% performance/payment bonds will be required for the full amount of the subcontract price.
Project work also includes, but is not limited to, vibration control and monitoring, environmental species monitoring, preparation of the staging and access area near R-95, gopher tortoise relocation, turbidity monitoring, dune vegetation planting, sign and post and rope installation, and sand fencing.
Monitoring, Optical Monitoring, Crack Monitoring, Special Inspections, Material Testing BL Construction GroupALYSIA CAPARROS9173282333INFO@BLCONSTRUCTIONGROUP.COM Minority Owned Business (MBE)Disadvantaged Business Enterprise (DBE)FLOORING, LOCKERS Blog Post Group5134341857 Minority Owned Business (MBE)Women Owned Business (WBE)Service Disabled Veteran Owned Business