Search results for: vine street sidewalk

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 31
  • Vine Street Sidewalk Improvements

    Type : Bid Notification

    Due : 09 Feb, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 11 Jan, 2023 (16 months ago)

    DOCUMENT 001113 ADVERTISEMENT FOR BIDS TOOELE CITY CORPORATION, 90 NORTH MAIN STREET, TOOELE, UTAH, 84074 General Notice: Tooele City (Owner) is requesting Bids for the construction of the following Project: Vine Street Sidewalk Improvements.

    From: Tooele (City)

  • SE District, City of Poplar Bluff, replace existing sidewalks along the north side of Vine Street on the street between 5th and Broa...

    Type : Bid Notification

    Due : 14 May, 2024 (in 8 days)
    Posted : 9 days ago
    Started : 11 Apr, 2024 (24 days ago)

    The address of the City of Poplar Bluff is listed above,\nand located at 501 Vine Street, Poplar Bluff, MO 63901.\n\nThe project shall consist of:\n\nThe project looks to replace existing sidewalks along the north side of Vine Street on the street between 5\" and\nBroadway, in downtown Poplar Bluff, MO. The new sidewalk will be the same width as previously and with ADA\nrequirements as much as possible.

    From: Department of Transportation (Transportation)

  • Riley Avenue & 17th St. Sidewalk and Streets

    Type : Bid Notification

    Due : 16 May, 2024 (in 11 days)
    Posted : 15 days ago
    Started : 18 Apr, 2024 (16 days ago)

    Sidewalk and Streets Ref. #: RFB-24-199 Type: RFB Status: Open Open Date: Apr 18th 2024, 5:00 PM MST Questions Due Date: Apr 29th 2024, 11:00 AM MST Close Date: May 16th 2024, 11:00 AM MST Days Left: 14 Project Description:Replace pavement and construct curb and gutter along Riley Avenue and 17th Street. Alternate bids are included for the construction of sidewalk, sidewalk ramps and driveway entrances with curb returns.

    From: Yuma (City)

  • 0.48 mi of water main replacement on Homer Street from Michigan Avenue to M-43 with a lane reduction...

    Type : Bid Notification

    Due : 06 Dec, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 25 Nov, 2019 (about 4 years ago)

    Proposal 33817-124074 0.48 mi of water main replacement on Homer Street from Michigan Avenue to M-43 with a lane reduction safety improvement including concrete pavement removal and construction of concrete curb and gutter, driveways, sidewalk, sidewalk ramps, sewer, and drainage between Vine Street and the US-127 northbound exit ramp in the city of Lansing, Ingham County. ** 1132 K or Comb/Jt. 1132 Ba, Ea or Comb/Jt. 1132 Ba, J or Comb/Jt. 1132 Ea

    From: Michigan Department of Transportation (Transportation)

  • Route 22 Crosswalk, Sidewalk & Related Improvements

    Type : Bid Notification

    Due : 26 Aug, 2024 (in 3 months)
    Posted : 20 months ago
    Started : 11 Aug, 2023 (8 months ago)

    VA-2022-05\nRoute 22 Crosswalk, Sidewalk & Related Improvements\n\nNOTICE TO BIDDERS\n\nSealed proposals will be received by the Village Clerk of the Village of Bronxville,\nWestchester County, New York, atthe Village Hall, 200 Pondfield Road, Bronxville,\nNew York, until the bid opening at 11:00 A.M., on Friday, August 26, 2022, for the\nRoute 22 Crosswalk, Sidewalk & Related Improvements; Village of Bronxville,\nWestchester County, NY.

    From: Bronxville (Village)

  • 24-03 Murray Collectors: 300 W, 4800 S, and Vine Street Mill and Overlay

    Type : Bid Notification

    Due : 26 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 03 Mar, 2024 (2 months ago)

    It also includes pedestrian ramp improvements, limited curb and gutter replacement and sidewalk/pedestrian improvements, and pavement striping. Schedule C (Vine Street) includes 394,340 SF of mill and 7,394 tons of bituminous concrete pavement from State Street to 5600 South on Vine Street.

    From: Utah (State)

  • 24-03 Murray Collectors: 300 W, 4800 S, and Vine Street Mill and Overlay

    Type : Bid Notification

    Due : 26 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 03 Mar, 2024 (2 months ago)

    It also includes pedestrian ramp improvements, limited curb and gutter replacement and sidewalk/pedestrian improvements, and pavement striping. Schedule C (Vine Street) includes 394,340 SF of mill and 7,394 tons of bituminous concrete pavement from State Street to 5600 South on Vine Street.

    From: Utah (State)