Type : Bid Notification
The Town of Ripton requests sealed bids from qualified contractors to shape a damaged streambank and install a 4 foot thick riprap revetment, total area 0.02 acre, along the class 4 portion of Wagon Wheel Rd (TH 15) and the Middle Branch of the Middlebury River, per the attached plans. Stone color must match the river stone (no white stone). Construction must be completed on or before August 1, 2020.