Search results for: walking trail milling

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 10
  • Joe Gulley Walking Trail Milling & Overlay Project

    Type : Bid Notification

    Due : N/A
    Posted : 20 months ago
    Started : 25 Apr, 2022 (about 2 years ago)

    Joe Gulley Walking Trail Milling and Overlay Joe Gulley Park 391 Bellaire Bivd. Kenedy, TX. 78119 Project limits are approximately 60,750 SQ FT of the existing walking trail. Project is going to consist of a 2 mill/planing and 2 overlay, and to recompact or replace existing base as needed. Prime tack shall be applied to all base and concrete surfaces and edges for bonding.

    From: Kenedy (City)

  • Robinson Park Resurfacing

    Type : Bid Notification

    Due : 20 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 21 Sep, 2023 (7 months ago)

    Scope of work to include but not be limited to the following: milling and resurfacing of entire walking trail & resurfacing and restriping of parking lot and driveway. All resurfacing should include the application of a minimum of 2 inches of State F mix asphalt, rolling and packing, debris removal and other related tasks.

    From: Georgia (State)

  • Jackie Robinson Training Complex Walking Trail

    Type : Bid Notification

    Due : 09 Aug, 2023 (8 months ago)
    Posted : 10 months ago
    Started : 02 Jul, 2023 (10 months ago)

    walking trail, two driveway connections to the adjacent roadways, a milling access road connecting the two driveway aprons, resurfacing and existing parking lot, and installing 60" pipe culvertDocumentsDownload all documentsFilenameTypeDate ModifiedStatusAddendum 1AddendumAug 1, 2023CompleteInstructions and SpecificationsMiscellaneousJul 5, 2023CompleteBid PlansPlansJun 30, 2023CompleteBridge SetPlansJun 30, 2023CompleteBridge Set-DuplicateBid Document

    From: Indian River County (County)

  • Jackie Robinson Training Complex Walking Trail

    Type : Bid Notification

    Due : 15 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 22 Feb, 2023 (14 months ago)

    Bid DetailsPlanholderJackie Robinson Training Complex Walking TrailActiveBrowse Awarded BidsDownload Bid PackageBid DetailsAgency NameIndian River County - Division of PurchasingBid WriterShelby BallBid IDITB-2023012-0-2023/sbBid TypeITB - Invitation to BidBroadcast Date02/22/2023 10:24 AM EasternFiscal Year2023Due Date03/15/2023 2:00 PM EasternBid Status TextNoneScope of WorkThe proposed project includes a 12’ wide millings walking trail, two (2)

    From: Indian River County (County)

  • Request for Proposals: Resurfacing FY 2022(Addendum 2 of 2)

    Type : Bid Notification

    Due : N/A
    Posted : about 2 years ago
    Started : 28 Feb, 2022 (about 2 years ago)

    Brannen Street will require milling only near the McTell walking trail to ensure the asphalt is flush with the trail. Exact quantity will be established during construction. Knight Drive will require milling only on the curb and gutter road section. For the remaining portion of the road, the asphalt will be sloped into the pavement edges.

    From: Statesboro (City)

  • Three_Oaks Storm Water Improvements_Phase 2_

    Type : Bid Notification

    Due : 10 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 26 Jan, 2023 (15 months ago)

    Trail Clearing including Limbing Trees to 10' Height at Trail, Raking, Grubbing and Offsite Disposal of Debris 120 l.f. $ $ 49 Walking Trail Grading Complete including Excavation, Embankment, Fine Grading, and Compaction of Walking Trail and Shoulders Area 120 l.f. $ $ 50 Walking Trail Asphalt Milling, 4" thick & +/-6' wide over Geotextile nonwoven fabric (US Fabrics US-90NW or equal) 80 s.y. $ $ Bidder: _______________________ Page 2 of 4 THREE

    From: City of Albany (City)

  • BID - Asphalt Paving Projects for Forest Preserve

    Type : Bid Notification

    Due : N/A
    Posted : 13 months ago
    Started : 06 Mar, 2023 (14 months ago)

    AREA #1 WALKING TRAILS BASE BID: MILL IN PLACE EXISTING ASPHALT WALKING TRAIL PAVEMENT / MAIN AREA The Main Walking trail should be milled in place and prepared for new asphalt. Bid based on milling in place the existing main walking trails approximately 9,500 lineal feet. Milling in place to add to the existing base stone creating a hybrid base to help stabilize the subgrade.

    From: Winnebago (County)