Type : Bid Notification
Wall repair at the Iowa DOT Albia Maintenance Garage
Wall repair at the Iowa DOT Albia Maintenance Garage
FLOREANO RRCC RIVER WALL REPAIR AND TERRACE EXPANSION REBID Agency: Rochester, City of Category:Construction Vertical: Building Construction; Rehabilitation & New Construction - Construction Issue Date:03/25/2024 Due Date: 04/30/2024 Ad Type:General
The Town of Atherton intends to repair the existing retaining walls that supports the southern side of Marsh Road and adjacent properties in the spring and summer of 2016. The Marsh Road retaining wall also supports and forms one of the walls of the Atherton Channel and is in need of major repairs. This project includes installation of a “U” shaped cast-in-place structure that could potentially accommodate a future cover.
The proposed improvements include, but are not limited to, the furnishing of all labor, materials and equipment for the repair/construction of the North wall as shown on the plans. Bids must be submitted through the City of Davenport e-bidding system (https://davenport.ionwave.net); no emails, faxes, paper copies or any other submission method will be accepted.
General problem/solution to restore the structural properties for the damaged CMU wall at door number 101. f. Masonry preparation and repair. g. Window installation, properties, and windowsills. h. Vehicular safety requirements and applications to include black and yellow reflective tape and bollards. i.
RVC24-03 Woodbury Street Retaining Wall Repair March 15, 2024 Instructions To Bidders – CCSNH 00204 - 3 2.4 Bids to be scanned and transmitted by electronic mail to memoore@ccsnh.edu no later than the bid deadline. PART 3 RECEIPT AND OPENING OF BIDS 3.1 The bid opening officer will decide when the specified time has arrived, and no bid received or presented thereafter will be considered.
Crowder College (RFP) - Exterior Wall Repair for Student Center Project Overview: We are currently seeking proposals for the repair of aesthetic storm damage on the exterior wall of our Student Center building. This damage includes minor structural issues and cosmetic damage, such as cracks and paint deterioration.