Search results for: water and erosion control

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 4,712
  • Water Works: Mountain Grove Erosion Control Project-Shore Road Design Plan

    Type : Bid Notification

    Due : 01 Dec, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 16 Nov, 2022 (17 months ago)

    Sediment and erosion controls, proposed stormwater Manchester Water Works – Mountain Grove Erosion Control Project – Shore Road Design Plan in Auburn, NH, December 2022 9 treatment and control practices, inspection and maintenance of stormwater best management practices, and other aspects of the design shall be in accordance with the criteria listed in the NH Stormwater Manual, (December 2008), except as noted in the state Alteration of Terrain state

    From: City of Manchester (City)

  • 220005 Brooksville AASF#2 Erosion Control & Storm Water Pond Rehab, Brooksville, FL

    Type : Bid Notification

    Due : 10 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 19 Aug, 2020 (about 3 years ago)

    Advertisement Detail   Department of Military Affairs Invitation to Bid 220005 Brooksville AASF#2 Erosion Control & Storm Water Pond Rehab, Brooksville, FL Advertisement Number: 220005 Construction Version Number: 003 Advertisement Begin Date/Time:08/19/2020 - 02:00 P.M. Advertisement End Date/Time:09/10/2020 - 02:00 P.M. Mod: 09-10-2020 03:39:16 Last Edit:Thursday, September 10, 2020 at 03:39:47 P.M.  

    From: Florida Department of Management Services (State)

  • FALLING WATER EROSION CONTROL

    Type : Contract

    Due : 31 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Jul, 2021 (about 2 years ago)

    FALLING WATER EROSION CONTROL Solicitation ID/Procurement Identifier: 12445121P0009 Ultimate Completion Date: Tue Aug 31 17:00:00 GMT 2021

    From: Federal Procurement Data System (Federal)

  • Range 17 Water and Erosion Control Project Number TM-70427-7P, Fort Gordon, GA

    Type : Bid Notification

    Due : 12 Aug, 2022 (20 months ago)
    Posted : 22 months ago
    Started : 13 Jul, 2022 (21 months ago)

    Army Corps of Engineers (USACE) Savannah District (SAS) issues Invitation for Bid (IFB) solicitation for a firm-fixed price (FFP) construction contract for project number TM-70427-7P Range 17 Water and Erosion Control, Fort Gordon, GA.The project is competed in accordance with FAR Part 14, Sealed Bidding. PROJECT DESCRIPTION: The Design Water/Erosion Control project is on Fort Gordon, Georgia, on a portion of the MPMG Range 17.

    From: Federal Government (Federal)

  • DEPARTMENT OF WATER RESOURCES URBAN COMMUNITY DROUGHT RELIEF WATER STORAGE TANKS REPLACEMENT PROJECT

    Type : Bid Notification

    Due : 03 May, 2024 (Tomorrow)
    Posted : 21 days ago
    Started : 26 Mar, 2024 (1 month ago)

    The District relies on both surface water and groundwater resources, including nine currently active stream diversions, one groundwater spring, and eight active groundwater wells. These sources are derived solely from rainfall within the San Lorenzo River watershed.

    From: San Lorenzo Valley Water District (Utilities)

  • Notice of Application for State Water Quality Certification - POA-2016-00537 Valdez Bay - Valdez Fisheries Coastal Erosion Control

    Type : Bid Notification

    Due : 11 Mar, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 11 Mar, 2021 (about 3 years ago)

    Conservation that the discharge will comply with the CWA, the Alaska Water Quality Standards, and other applicable State laws.

    From: Alaska (State)

  • City of Harbor Springs Merchants Walkway and Plaza Design

    Type : Bid Notification

    Due : 22 May, 2024 (in 20 days)
    Posted : 12 days ago
    Started : 04 Apr, 2024 (27 days ago)

    Description: Project Category Code:Concrete Walkway, Paving - Concrete, Water Utilities, Construction, Retaining Walls, Concrete/Formed/Flatwork/Foundation, Concrete Pavement, Fencing/Guardrails/Handrails, Grade and Surface, Stormwater Improvements, Erosion Control - Temporary, Walkway/Passage/Corridor, Traffic Control Devices (Signals, Signing, etc.), Pedestrian Improvements, Storm Drain and Paving, Sewer and Water Construction, Masonry Construction

    From: Orchard Hiltz McCliment Inc (Other)