Type : Bid Notification
23-29-C CSA 1 Tamarack Water Infrastructure Replacement The work to be done consists, in general, of installing approximately 3,900 feet of High-Density Polyethylene (HDPE) water main along with the necessary appurtenances, replacing the function of the existing asbestos cement pipelines. The project also includes installing approximately 45 service connections with meters and meter boxes and installing five fire hydrants.